Just finished a time series of land surface temperature 2020-2025 and can be clearly noted that high temperature are mostly generated in built up area for instance kabarnet town heat signature is high compared to timboiwo @surveyor5916 ,@SurveyorOfKenya what do you think folks?
The year is 1989.. you just bought a brand new Mercedes Benz W124 .. with the M102 Carb 🔥.
This is as clean as it gets. One owner, stock car. All electrical including sunroof. 🔥🔥🔥
Bei ni mbaya… mbaya sana.
Will post more details and pricing kesho
In construction and engineering projects, setting out is not merely a preliminary field activity.
It is the critical translation process between design intent and physical reality.
Before excavation begins structural elements are placed, i.e the bases and strip footing.
I challenge anyone from the Rift Valley to name a single project the national government has completed in their county during Ruto's four years in office.
Here are the only allowable scales when presenting Survey plans in Survey of Kenya or Ardhisasa
1:250 | 1:500 | 1:1,000 | 1:2,500 | 1:5,000 | 1:10,000 | 1:25,000 | 1:50,000 | 1:100,000 | 1:250,000
This is as per the Survey Act, Cap 299