@ianvisits Dreamland Ian. I saw the staging plans from a decade ago, it’s simply too complex to deliver. A decade of disruption won’t bring the required economic benefit. ETCS would be better and cheaper, along with a load more signalling sections for pseudo moving block
@NicholasLe81575@BareLeft Certainly possible and basically how Crossrail eventually got delivered. But rejigging the packages basically at the request of the contractors pre tender speaks volumes IMO
@MathsHomeWorker@makefreebytruth Literally TPWS. OSS and multiple OSSs on approach to track speed down. MAR and MAY signalling controls. As well as train dynamic design to prevent derailments (e.g. the two at Peterborough which were huge overspeeds (driver error anyone) and neither train derailed)
@MathsHomeWorker@makefreebytruth Any possible side on or head on collision is protected by train protection. So arguably your claim is impossible to achieve. Unless you want to explain some plausible scenarios
@MathsHomeWorker@makefreebytruth You’re honing in on specifics to divert from your original claim. The number of scenarios where an error by a driver could cause thousands of deaths is almost infinitely small. Even Elstow was both no TPWS at the signal and a driver failure and was single figure deaths
@MathsHomeWorker@makefreebytruth You can highly doubt all you like.
All signals not being equipped with TPWS is because the chance of collision at those signals is tiny, albeit possible as Elstow proved this year. I believe the first incident that could have been prevented by TPWS since it was introduced.
@Knobh34d@myles_premium_ Relatively possible to be the latter seeing as the former have a giant vested interest. The truth is somewhere between the two. It isnt hundreds of billlions as RMT say but it s a huge number. If wages keep escalating the economic case changes
@MathsHomeWorker@makefreebytruth What do you mean ‘a lot’? There are almost zero units with none of those systems and they run on heritage lines. Any mainline train has one of those. Unless you would like to cite your sources?
@MathsHomeWorker@makefreebytruth I have a very senior job managing the commissioning of the systems that protect trains. TPWS (as half a solution), ETCS, CBTC, TBTC. Planes have nothing like any of those systems.
@MathsHomeWorker@makefreebytruth Wrong. The systems protect trains, as does engineering. The person with that responsibility is actually the signaller.
@woxxy Not just tech, everything. Railways they pay a third or less of the going rate internationally. They pay programme managers (generalists) the rate that a post grad scheme PM gets in many places. It’s absurd and a massive false economy.
@NeilGarratt I frequently think of integrations government systems could use and in the modern vibe coding age know they could be coded pretty simply. Clearly people like us would just be pricing too low
@jerryalderson@_the_train_guy Generally one does both these days but fair point, the early implementations were indeed only for “open doors 1-10 only” type signals rather than open doors “1-10 on left hand side”
@TrainManMike@_the_train_guy That’s a failure of engineering. And or failure of process. It’s like saying TPWS isn’t worth having because drivers can override it and do something wrong.