Our Last Month (September) Trading Recap.
Total Signals: 139
T/P Reached: 112
S/L Reached: 12
Closed: 05
Running: 00
Invalid: 10
Success Rate: 91.37%
Total PnL: +13189%
Join our premium and start growing your portfolio with Alpha Crypto Signal. Let this October journey begin with us. Simply send a message and be a member of Alpha Crypto Signal premium.
Feel free to search in our channel and verify the signals yourself.
$ZETA broke the falling wedge and finished the retest.
Price is ~0.0396, now testing the horizontal support zone. Long while that floor holds. Continuation stays on the table.
A 4h close under the zone kills it.
$ORDI is coiling in a 4h descending triangle, stuck under the upper trendline and the 55 EMA near $3.70.
Price is ~3.65, testing the $3.50β$3.55 demand base. The EMAs are still capping it. Long only on a flip of the trendline and 55 EMA into support.
A 4h close under $3.50 kills it.
@n3oRandom We are a team of traders, so we stay active throughout the day. We also share limit orders in advance, so you'll rarely miss more than one or two trades out of ten.
Our Last Month (September) Trading Recap.
Total Signals: 139
T/P Reached: 112
S/L Reached: 12
Closed: 05
Running: 00
Invalid: 10
Success Rate: 91.37%
Total PnL: +13189%
Join our premium and start growing your portfolio with Alpha Crypto Signal. Let this October journey begin with us. Simply send a message and be a member of Alpha Crypto Signal premium.
Feel free to search in our channel and verify the signals yourself.
$PENGU is retesting the breakout of its 4h symmetrical triangle.
Price is ~0.00773, right on the resistance-turned-support line. Long only on a 4h close that holds above it. That keeps the continuation open.
A close back inside the triangle kills it.
$OP is holding the lower horizontal support after the extended decline.
Price is ~0.112 and consolidating on the zone. Interesting for spot accumulation if it holds. Long on a clear bounce. Next resistance is the 50/200 EMAs near $0.117β$0.118.
A 4h close under the support kills it.
initia:native is building a multi-month rounding bottom on the daily.
Price is ~0.166 and well above the full EMA cluster (55 at ~0.111, 100/200 near $0.095β$0.096). It is approaching the macro neckline at $0.20β$0.21. A clean daily break and flip of that level opens a fast push toward $0.30+.
A daily close under the rising base kills it.
$INJ broke the 4h symmetrical triangle and is retesting the broken trendline as support.
Price is ~8.10. Long while the retest holds. Next target is the recent highs near $9.40.
A 4h close back under the trendline turns it into a fakeout.
$ZEC is forming a cup and handle on the 4h and has cleared the weekly VWAP near $1,272.
Price is ~1,312 and entering a low-volume zone. The long opens on a 4h close above the handle high around $1,360. Next target is $1,480β$1,520.
A close back under the VWAP and $1,240 kills it.
celestia:native is back at horizontal support after the decline.
Price is ~0.53. The structure has weakened. Staying cautious. No long unless this level holds and $BTC reclaims $82k.
A 4h close under the zone opens further downside.
$ICP is approaching the lower boundary of a falling wedge.
Price is ~2.58. Long on a clear bounce from that line. The confirmation is a break of the upper trendline. That would open a reversal.
A 4h close under the lower boundary kills it.
stellar:native is back at the confluence of horizontal support and the rising trendline.
Price is ~0.168. That zone has held before. Long on a clear bounce from it. Next resistance sits near the 50 EMA around $0.19.
A daily close under the trendline kills it.
#ALGO Update:
This isnβt resistance anymore. It has become the Great Wall of China for $ALGO.
Strong buying pressure is visible here, which is why sellers are failing to push the price below this zone.
The probability of moving higher increases after a green candle closes above the zone. Keep $ALGO on your watchlist.
#ENA Update:
$ENA is bouncing off a former resistance level that has now flipped into support. The HTF trendline is also breaking out, adding another bullish confluence to the setup.
Let's see how $ENA delivers. π
$UNI Update:
$UNI jumped +4% from our entry before the market dump hit, eventually triggering our Stop Loss.
Our first loss of the month, but that's part of the game. Weekend is here, and the market looks uncertain. No need to force trades.
If we spot a solid setup, we'll share it with you. Until then, have patience.
Missed $BCH
Missed $HBAR
Missed $ZEC
Don't let $UNI slip away too .One opportunity at a time. Let's see what $UNI has in store for us.
Note: As always manage your risk. No setup is guaranteed, and never put all your funds into a single trade.
solana:jtojtomepa8beP8AuQc6eXt5FriJwfFMwQx2v2f9mCL is building a double bottom on the $0.42 support.
Price is ~0.421. The second low is in. Long while that zone holds. A bounce targets the $0.49 resistance.
A 4h close under $0.42 kills it.
$XRP is building a double bottom on the $1.25 support zone.
Price is ~1.31. The second low is in. Long opens on a clean neckline break with follow-through. That sets up a push toward the prior highs.
A 4h close under $1.25 kills it.
$CRV is trading inside an ascending channel on the 4h.
Price is ~0.355, still above the lower boundary. Long on a clean reaction off channel support. First target is the mid-line, then the upper boundary.
A 4h close under the channel floor kills it.
$NEAR is testing the bottom of the $4.55β$4.65 consolidation zone.
Price is ~4.64 and showing distribution. A 4h close under that floor opens further downside. Until then it is just a test.
A reclaim of the zone midpoint kills the short idea.