I found the circle.
The marks were already there.
The watchers were already awake.
Only 444 subjects will pass through.
Entering Astryx before the veil closes.
https://t.co/cvoocaRINu
I'm giving away 2 GTD & 5 FCFS spots for ZelijOrigins
888 1/1 Pieces
The art is genuinely fascinating
To enter:
- Follow Me & @ZelijOrigins & @Ismailiwi1
- Like & Repost this post
- Tag a friend & tell me your fav NFT collection
Winners will be handpicked and announced in 24H
Trenches have been rough, been getting lot of DMs lately of people zeroing out and asking for help so it feels right after a big win I share back some of it π
Put on a Jotchua pfp with verified X and comment your story with your Solana addy
Sending 200$ to 5 people π
The start of my account 01/01/2025
Been a wild ride little story about me:
I vbeen in crypto nearly 6 years now at the start I turned multiple times 2-3k into multiple 6 figs and than lost it all when Altcoin seasons were still on Binance.
Never gave up and learnt a lot about crypto and made it one of my full time jobs to generate my income.
Nearly anything you can imagine I tried in crypto. I did ICO plays and gaming presales on BSC, I did all Olympus dao forks, I did Tomb fork farming on 373626% Apr. I rode up some of the biggest dexes from 0 to 3b LTV. After I made my first 7 figs in crypto I started liquidity farming with bluechip crypto over on EVM chains and thatβs how I generated daily income.
I always hated NFTs and Memecoins never understood why I should invest in them. Than I found Solana and understood itβs all about becoming a community member and sharing same emotions with other online characters on the internet and itβs became obsessing. I CTO Styro Steve first in December without an X account at 800k mc I dropped lot of my money into set up the TG and been working on marketing, onboarding hyping the community. This is where I met my first friends in crypto we sent it to 20m it was a Styrofoam head of a psycho who collected his girlfriends hair. After this is when I made my X account and understood I wanna dig deeper into memes and wanna be part of this side of crypto (before I never knew any of your favorite KOLs) on other chains we have totally different KOLs with more insightful content lol.
Than obviously I had 100 followers and I had to grow faster and I already made it in crypto so I wanted to use it as pay to win to grow faster. I publicly blasted big accounts conviction plays to gain recognition which worked out really well lot of the people who I met from aping 50k into butthole are still following me and are close to me.
Butthole did a 17m to 140m run after
I did the same with Trump pump 50k into that and 1% in a single candle into Titcoin which started the first run. Titcoin was a 150x size play all these documented on the timeline.
Iβm not a big KOL yet but I already had my networth before Solana and now I will use it to build a long lasting personal brand in this space and try to help make others money and maybe run up one of the next big things in crypto as a legacy play.
Lot of words most likely none of you read it but if yes then thanks for being here with me in this journey I truly appreciate it.
Secured a few whitelist spots from @GoomblesETH.
Mint Details
β’ June 10, 1 PM UTC
β’ Supply: 999
β’ Mint Price: 0.0011 ETH
π Giving away 5 Guaranteed Spots.
To qualify:
β Follow @GoomblesETH & @GRINDX100x
β Like & Repost
Good luck.
Iβm giving out 15x WL for @lost__52
10,000 supply Coming on ETH
Website: https://t.co/qDE8xhq5T8
Follow @lost__52@suntrixonchain@ZaxWeb3
Like and retweet : https://t.co/9yGmVeZaHP
Comment evm wallet and tag 2 friends
You have 24hrs
8 signals have locked onto the call, holders will be added to LostList Phase One.
The network is still growing. Reply with your favorite collection you think should be tuned into the signal next. ππ‘