When people hear that mills supplying the auto industry are shutting down, they assume that also applies to structural steel mills. But that's not the case, and America's structural steel industry remains a success. Read more at https://t.co/7D1BxQaEJw.
This week we are highlighting a past plate work project that we modeled into built-up pipe sections with transitions and flanges. Many small parts made up the 1,100 shop drawings but the entire project only consisted of 35 #tons of #steel.
#axissteel#steeldetailing#tekla
This student recreation center at @csunorthridge required 2,100 tons of #steel. Our #steeldetailing team created over 8,100 shop and erection drawings for this project. This included #handrails, #guardrails, #stairs, stadium seating for the new gym, and a running track.
#tekla
Breaking: #Construction loses 975,000 jobs in April as industry's jobless rate soars to 16.6% in first full month of #coronavirus impact https://t.co/RPxIJ7W6QQ @TomIchniowski
We are proud to have worked on this 2018 #AISC IDEAS² Award winning structure on the campus of the United States Air Force Academy.
The main structure had many sloping members that were moment connected together in A-frames and required over 350 tons of #steel.
Located in Corvallis, OR, this v-shaped building consisted of two three-story wings and required 700 tons of steel. This building is used by Oregon State Credit Union as their operations center. We completed this job in 2015 for Sunsteel.
#axissteel#tekla#steeldetailing#steel
We were named a Top 10 #BIM Consulting/Services Company of 2020 by #ConstructionTechReview Magazine!
We are incredibly honored to be recognized as a company that is at the forefront of tackling customer challenges in the #construction industry.
This #Tekla Model Award Winning project completed for Mountain States Steel required +4,000 shop and erection drawings detailing the #StructuralSteel, tanks, stairs, rails, caged ladders, radial stairs and ladders attached to the tanks, and octagonal platforms around the tanks.
This week we are highlighting our #SteelDetailing work on the @USUFootball@Maverik Stadium we completed for @SunSteelLLC in 2015. This project replaced the old press box with a 5-story press box and a pedestrian walkway bridge and required +500 tons of #steel.
"We measure for FF/FL and as-built conditions with a single technician. In the old days, we’d have three people doing that" - This is a great article showing how #3DLaserScanning can be used for #concrete contractors.
https://t.co/Lo3m5BU71M
We recently had the privilege of detailing a new building at the #trimble campus in Westminster, CO. Trimble is the parent company of @Tekla software which we use to perform our #steeldetailing work. This project required 760 tons of #steel and +2000 shop & erection drawings.
Check out the latest data & statistics within the #construction industry released by @constructdive: https://t.co/sWbg0wCxXm. The article covers recent changes in the industry such as the increasing complexity of #projects ⚒ Click the link above to read more! 📈 #LaytonWay