Check it out! A revamped version of Tree Staking is here. Oh, and did you know you'll soon be able to stake CBY too? Maybe time to stack up on some extra $CBY? NFA 😉@Carbify_io
Please note that Josh's X account has been illegitimately accessed.
The post regarding a SUPRA token on Solana is FAKE and was not posted by him.
Please DO NOT send funds to that Solana address, nor engage with any further posts from his account, until further notice.
Josh and the Supra Team are actively looking into the situation and will update you when we have more information.
Supra ( $SUPRA ), a diamond in the rough!
Supra has been quietly building and shipping new products, its future is bright. Its price is extremely low now. Strategy: Buy, stake for 8% return and wait for its glory day to arrive.
@SUPRA_Labs@JoshuaTobkin
Did you know?
In mid 2025, $Supra Blockchain processed 25 million transactions in just 24 hours and the chain didn’t even flinch. No outages. No congestion. Just smooth, sub-second finality the entire time🔥🔥
$Supra is seriously built different and delivering differen, yet it’s still flying way under the radar. This project deserves way more attention.
#Supra
Everyday I'm more excited about the future of supra:native
They're officially signing the new terms and conditions with @Mastercard for their partnership program today.
The token dashboard is being rolled out. Community requested tracker to have a transparent token distribution visual available to the public. Building trust.
SupraFX (RFQ Ai agentic trading platform)
SupraOS (Ai voice command protocol)
SupraEVM (Ethereum Virtual Machine)
Just to name a few...
All making their way onto the test net and/or main net and will be huge players in their respective fields.
@SUPRA_Labs is taking the next logical step in technological advancement, first.
Vertically integrated, automated blockchain tech paired with cutting edge Ai capacity to usher in the new age of human organization, interaction and transaction.
With all of these tools combined, running a business, trading equities, sending money, paying bills, setting schedules, organizing foundations, credit checks, legal documentation verification and countless other tasks will be done by literally speaking it into existence.
Ai learning + block chain memory and security = Your own personal supra assistant.
You think the thought, speak the words and the tech does the rest.
It's closer than you think.
Welcome to the future.
Welcome to supra:native
Most chains ask you to trust their throughput numbers. We would rather show you what the architecture lets you build. 🏗️
‣ A DeFi protocol that does not choke when the market moves, because transactions run in parallel, not in a queue.
‣ An agent that cannot break its own risk rules, because the rules live in consensus.
‣ A cross-chain product with no bridge to hack, because SupraNova settles L1-to-L1 directly.
Same stack. Same token. Same trust assumptions.
The benchmark is not the spec sheet. It is what ships on top. 🚀
People are not ready for the revolution that $SUPRA is going to unleash with the combined power of the vertically integrated L1 blockchain and top tier Ai functionality.
$SUPRA is going to be a household name and used as a verb to describe everyday tasks in the near future.
$SUPRA IS SHIPPING WORLD-CLASS TECH IN COMPLETE SILENCE… WHILE PRICE IS STILL ASLEEP AT ~$0.00034 😱🔥
This isn’t another hype L1. Supra is the first vertically integrated AutoFi chain — everything (oracles, automation, cross-chain, AI agents) baked natively into one L1 for zero-friction DeFi.
Fresh heat (May 2026):
- May 11 → Mainnet gas price upgraded 1,000x after governance vote (spam-proof + dev-friendly)
- April 20 → SupraOS Alpha live: on-chain AI agents enforcing rules with full data sovereignty
- MultiVM testnet (EVM + MoveVM) + $250K grants for builders
- SupraNova (bridgeless cross-chain) + parallel execution maturing fast 500,000 TPS tested. Sub-second finality.
Native Threshold AI Oracles. dVRF. Zero-block-delay AutoFi.
Now the tokenomics that could 50-100x this when adoption hits:
Max supply 100B | Circulating ~28.6B | FDV still ~$34M Allocation (official & locked tight):
- 22.6% Foundation/Treasury
- 21.0% Validators & Stakers
- 20.7% Early contributors
- 16.0% Team - 0% at TGE, founders locked 24 months, then slow linear drip
- 11.0% Ecosystem + 4% airdrop
6 real utilities driving DEMAND:
- Gas + AutoFi tasks
- Staking (validators need 55M $SUPRA min)
- Native Oracles / dVRF / automation
- SupraNova cross-chain - SupraOS AI agents
- PoEL = Proof of Efficient Liquidity ←THE KILLER PoEL lets the same $SUPRA earn staking rewards + DeFi LP fees + auto-vault yields at the same time.
Triple yield.
No capital lockup.
Liquidity bootstraps the chain while securing it.
Team said it straight (May 21): high supply but real deflationary pressure coming from revenue + 6 utilities.
Backed by $42M+ top VCs.
Mainnet live since Nov 2024.
Builders are loading up.
Price still at ATL territory… but the tech is already ahead of most chains.
You sleeping on $SUPRA or positioning before PoEL + AI agents explode?
Drop your bias 👇 Bulls or waiting for the next narrative? (As of May 26 2026 — DYOR, but this one actually ships)
#SUPRA #AutoFi #CryptoAlert #altcoin
Supra ( $SUPRA ), a diamond in the rough!
Supra has been quietly building and shipping new products, its future is bright. Its price is extremely low now. Strategy: Buy, stake for 8% return and wait for its glory day to arrive.
Supra ( $SUPRA ) is among the more advanced Layer 1 blockchains in 2026, particularly in its vertical integration approach and focus on real-time, automated DeFi (AutoFi). While it builds on established high-performance L1 innovations (e.g., from Solana, Aptos, Sui), it introduces meaningful differentiators that position it as a strong contender for the "latest generation" of monolithic-yet-composable L1s.
Supra is a high-performance, fully vertically integrated Layer-1 (L1) blockchain built for speed, security, and developer convenience. It stands out by natively embedding services (oracles, randomness, automation, cross-chain) directly into the consensus layer rather than relying on external add-ons. This enables "Super dApps" and its flagship vision: AutoFi (Automatic DeFi) — self-executing financial primitives that sense market conditions and act block-by-block without human intervention or off-chain bots. It uses Moonshot consensus (formally verified) with a Tribes & Clans architecture for extreme scalability: up to 500,000 TPS and sub-second finality, tested across 300 globally distributed nodes.
Supra's performance edge over key competitors:
Vs. Chainlink/Pyth:
Faster oracles with better decentralization/scalability and native L1 integration (no middleware fees/delays).
Vs. Solana/Sui/Aptos:
Comparable or better TPS (up to 500k claimed) with instant finality, plus built-in services they lack natively. MultiVM adds flexibility.
Supra Core Blockchain Utilities & Features:
Supra’s “all-in-one stack” gives dApps everything they need natively.
1. Native Oracles & Live Data Feeds — Fast, secure, tamper-resistant price feeds (e.g., BTC/USDC, ETH/USDT) with full finality in 600–900 ms. Includes Threshold AI Oracles. Data is available directly on Supra L1 (and powers 90+ external chains) with no extra integration or latency.
2. Decentralized Verifiable Randomness (dVRF) — Unbiased, on-chain randomness for gaming, NFTs, lotteries, and more.
3. Native System-Level Automation — Zero block-delay execution. Triggers and actions happen deterministically in the same block, powering true AutoFi (liquidations, arbitrage, rebalancing, lending, etc.) without keeper networks or MEV risks.
4. Cross-Chain Communication (SupraNova) — Bridgeless, trust-minimized messaging and asset transfers between L1s (live for ETH/USDC, expanding further).
5. MultiVM Support — Deploy on MoveVM (mainnet), EVM (testnet live), with SolanaVM and others coming. Existing contracts work with minimal or no changes and instantly access native services.
6. AutoFi Primitives — Self-operating DeFi stack (e.g., Dynamic Function Market Maker/DFMM, iAssets) that generates and redistributes protocol revenue.
7. AI Agents & IntraLayer — Full stack for autonomous on-chain AI finance agents that can sense, decide, and execute strategies.
8. Other Capabilities — Custom Supra Containers, Proof of Efficient Liquidity (PoEL), SupraScan explorer, developer grants/$100M Builder Competition, and strong focus on capital efficiency and decentralization.
This vertical integration reduces complexity, latency, and security assumptions while improving UX for both users and developers.$SUPRA Token Utilities$SUPRA is the unified native utility token (max supply 100 billion) that powers the entire ecosystem — L1 operations + all native services. It is designed with one of the broadest utility sets in crypto.
Key utilities include:
1. Gas Fees — Primary token for all transactions, smart contract execution, and AutoFi task fees on Supra L1.
2. Staking & Network Security — Validators stake significant amounts (e.g., 55M SUPRA per node) to secure consensus, oracles, dVRF, and automation. Earn rewards from fees/revenue.
3. Economic Security for Native Services — Staked/locked tokens back oracles, VRF, automation, and cross-chain features.
4. Cross-Chain Service Access — dApps on 90+ external blockchains use SUPRA to access Supra’s oracles and other services.
5. AutoFi Participation — Priority execution auctions, collateral in primitives, and task fees. Revenue flows back to the protocol/treasury/stakers.
6. Governance — On-chain voting for upgrades, parameters, and revenue splits.
7. Proof of Efficient Liquidity (PoEL) — Innovative dual-use model: stake the same tokens for network security and provide liquidity to earn from both staking rewards and DeFi fees (capital efficiency play).
8. Future/Deflationary Elements — Transition toward protocol revenue share (reducing reliance on inflationary block rewards) and other mechanisms to align long-term incentives.
Tokenomics highlights (as of latest data): Structured distribution with vesting (team/founders locked), focus on community/ecosystem allocation, and emphasis on sustainable growth.
Summary:
Supra’s utilities revolve around vertical integration + automation. It aims to be the go-to infrastructure for high-speed DeFi, gaming, AI agents, and cross-chain applications by making complex functionality (oracles, randomness, automation, bridging) a first-class, native part of the L1. The $SUPRA token ties it all together with broad, real-world demand drivers.
@SUPRA_Labs #Supra #Oracles #dVRF #AutoFiStack #CrossChain #Multivm #MoveVM #EVM #SolanaVM #SupraContainers #Suprascan #PoEL #iAssets #DFMM #AutoFi #SupraNovaai #FTO #AtmosProtocol #SupraLend #CrystaraMarkets #MetaSoul #PumpIt #Dexlyn #SkinFi #MaymunDAO #LOWCAPS #StarKey #RibbitWallet #Leo #NFT #Solana #Sui #Aptos #Chainlink #Pyth #Blockchain #cryptocurrency #Web3 #DeFi #RWA #NFT #Game #Prediction
Cross-chain agents need cross-chain trust. 🔐
An autonomous agent that operates across chains is only as safe as the weakest bridge in its path.
Build agents on SupraOS and that risk surface shrinks dramatically, because HyperNova does the heavy lifting underneath.
Less attack surface. More agent reach.
HyperNova in plain English...📖
A traditional bridge says: trust this group of validators we picked.
HyperNova says: trust the consensus of both chains, mathematically. 🧮
That is the difference between a bridge being a target, and the bridge concept not even needing to exist.
Why take the risk of a bridge hack? 🥷
Cross-chain has cost the industry billions. The pattern is always the same: external relayers, multi-sig assumptions, single points of failure.
HyperNova is our approach to removing the bridge as a category of risk. L1-to-L1 communication embedded in the Supra stack, without external oracles or relayers. 🔗
Trust the consensus of both chains. Not a committee in between. 🤝
Parallel execution is not new. What matters is how a chain handles the edge cases, the transactions that genuinely depend on each other. 🧩
SupraBTM's approach: detect dependencies at the memory level, not the transaction level.
That keeps the parallel path wide and the serialised path narrow.
Wider parallel lane. Narrower fallback. That is the win. 🏆
Your AI agent, secured by Supra. 🤖
An autonomous suite of agents that execute tasks on SupraOS while the rule check is enforced on chain in real time.
While most of the space is still talking about AI, we are building the rails for it to run on safely. 🛤️
SupraOS is the start, not the headline.