@JayCollinsFL Enjoy it while it lasts... all this "growth" has pushed out alot of farmers. I haven't smelled an orange blossom in 5 years. At what point do politicians realize too much growth equals destruction?
@Alaskacryptogi1 Fl DMV gave my dad a new tag once that read "H15 MAN." I joked and said it looked like it said His Man and my dad took it back and they gave him a new tag. 🤣
@AboutPediatrics@jimmy_irish@stkirsch Shouldn't these pregnant women have already been vaccinated as a child already? If so, she shouldn't have measles at all.
@dav31689@miabenetti Add in NAFTA changes in the 1990s and soaring property values around the same time. Grove owners either went bankrupt or sold out while they could and retired.
The public is about to learn that the DOJ, FBI, + other US/Foreign assets have been actively working behind the scenes in one of the largest criminal investigations in modern day history.
I’ve said it over and over again… all the tools are there. The signs are there— the RICO implementations, Space Force, Election Data (16’, 18’, 20’ 22’, 24’, 26’), Star-link, Executive Orders and directives, DOGE AI implementations into gov systems, bribery, blackmail…
President Trump has it all. He is setting the stage for our country to survive.
We all know it.. we feel it in the atmosphere— we are driving 117 miles an hour right now.. and at some point, the bubble has to pop.
( ⚠️from
Alachula county democrats)
“24 hours after Byron Donalds won the FL Governorship, the Texas-based Hillwood Development Company submitted a permit to convert an existing warehouse in Auburndale, Polk County into a data center.
During his time in the U.S. House and throughout his campaign for governor, Donalds accepted contributions from several AI PACs. This includes thousands from Ross Perot, Jr., the chairman of Hillwood’s parent company.
In 2023, the Auburndale City Commission rezoned the property of the now-proposed site to allow for, among other uses, “research and development, light manufacturing, health technology, and information sciences.” According to the city, this includes data centers. This also means, according to City Manager Jeffrey Brown, Hillwood’s proposed data center does not need a council vote for approval.
However, there are still regulations that the Hillwood site needs to pass, including electric and water usage limits. These are set by agencies separate from the City Commission.
An Auburndale Commission meeting on November 10th saw residents pack City Hall to give public comment against the Hillwood site. Among the most cited concerns were water and electric usage, along with noise concerns. Hillwood says the site would use “4,665 gallons of water per day” and “as much as 700 megawatts” of electricity per day once it is fully operational. Residents stated their concerns with “water usage, energy usage,” and strain on the local power grid.
What residents are saying:
💬 "My concerns are the water usage, the electric usage, what they’re going to be doing with the water once they use it — whether it’s going to affect the environment.”
💬 "We have a new neighborhood, and our power goes out all the time, so it flickers and it’s gone out quite a few times without even rain or anything, so that’s kind of concerning.’”
💬 "This community is saying no data center.”
Despite running on platforms of lowering bills and protecting communities from overreach, Florida Republicans are unwilling to intervene in this project.
Donalds, DeSantis, and Florida Republicans are beholden to the Corporate Interest PACs that got them elected. They are willing to look the other way as out-of-state companies move into local communities against the wishes of residents.
SOURCES:
https://t.co/WdAQNOBNFJ
https://t.co/7dAs5FFOeG
https://t.co/ikHIWA9YZR
#AlachuaDemocrats #ByronDonalds
🚨 BREAKING: MULTIPLE ARRESTS at an Orlando halal slaughterhouse after horrifying allegations of animal TORTURE!
AG James Uthmeier says aggravated animal cruelty charges are coming.
NO animal should suffer like this. Prosecute those responsible to the FULL extent of the law!