@M_Jay94 Exactly the inclusion of professionals from the built environment, encompassing engineering, architecture, planning, and property management, not just civil engineers
@CrimeWatchZW ICT equipment encompasses more than just phones; it includes street cameras, server and computer updates, and the entire digitalization process associated with rate payments.
@KuraChihota@cityofharare2 This has largely been the standard, with nothing new introduced except for the inclusion of 3DS. All other elements were already present.
@ny_emman@JMafume@cityofharare2 Integrated transport hub? And only shows buses? It's simply a bus terminus. A transport hub integrates different mode of transport systems I. E rail, air and road (kombis, buses, taxes & private vehicles). The concept is out of context because you can't pick it's precise location
@Savheya_Happie It totally depends on who the Architect or Project Manager is. In almost all the projects I've worked on, these hidden costs are included in the final design and budgeted for. This usually happens when project owners take a piecemeal approach.
#SowetoDerby is truly unique- most derbies are about drawing lines as tensions fly high, this one is where the fiercest rivalry in Africa meets the friendliest fans in the world.
@JMafume@matigary@DenfordNgadzio1@nickmangwana@cityofharare2 But doesn't it bother you that the very same biggest city in Southern Africa is slowly turning into a growth point? Like the standards have dropped and we are 1 year past the world class city mark! Like everything is everywhere zero order
@shavnyuy Seems that modern buildings may be missing the craftsmanship and human touch found in traditional structures.. This you can feel the textures, see the details- makes passing by a wonderful experience!
@Savheya_Happie Context is key, HCC guided by the Model Building by laws Chp. 11 sec 9-can only approve if your structure meet the following material requirements
@ny_emman Note that the majority of cities are situated along the watershed. Historically, water supply was not a significant concern provided wetlands remained undisturbed. Now it's a different issue-alluvial mining, building on wetlands etc.
@matigary Many building owners may not possess technical expertise as it is outside their field. This building was approved, inspected, and all stage payments were accepted by the council, so why is the owner being held responsible?