@MDizzy95@RaclemTCG@EDMsnob Not just that, a very similar situation happened in an earlier game that he did NOT call him up on. White Rose (gain 1 lore) and the magic broom.
He only called him up on the technicality, when it was advantageous for him, rather than always operating within the framework.
@mooreslawisdead Could the reason they cancelled it be, because there is limited packaging supply / wafers at TSMC, it would be more profitable to allocate it to MI300, rather than the 8900 xtx?
if MI300X -> MI300A, takes 2 GPU tiles and puts 3 CPU tiles on it... Whats to stop them taking all of the GPU tiles, putting all CPU tiles with a massive amount of HBM? extrapolating it out, 144cores, in a much denser socket compared to SP5, with no ram slots needed.
@witeken Just remember its already behind schedule -- https://t.co/Oovm4t5Vpd
intel 4 was supposed to be out q3 2022... Meteor Lake is launching Q2 / Q3 2022... which (if i recall correctly) is the first intel 4 product
@AdoredTV@mooreslawisdead just because someone beat you to the punch, doesnt mean you shouldnt do it. there is a reason I try to watch all of your videos as soon as they drop Jim, not for being first, but your insight.
also for when you crank out the wafer calculator :)
@BenHouston3D@kertgartner Just remember how long it took XSI to fully die in the industry. After the last version was released, I remember companies still using it 3-5 years after the fact, purely because of how much it costs them to switch pipelines.
@PapsIverson@betratfifathanu@kusamanetwork They also mentioned that the parachains wont be onboarded immediately, but at the beginning of hte next lease period.
That means every 7 weeks, all of the auctions reset and we get our KSM back (if i am reading this right)