Aap logo ne notice Kiya hoga , jo aj kal sabse zada reports or Articles publish kr rahe hain .
Unhone Ram Mandir ki audit report ab tk ap logo ko dikhai nahi hai
EVEREST — India’s first full-flow staged combustion (FFSC) rocket engine.
80-tonne class. Fully integrated. Designed and manufactured in Bengaluru, India.
Allahapur BHS near Tulsi Park has faced severe waterlogging for the second time in 3 days. Roads flood within 1–2 hours of rainfall. Please address this urgently
@NigamPrayagraj@CMOfficeUP
How much of India's infrastructure was built after 2014?
• 100% of Dedicated Freight Corridors
• 98% of Solar Capacity
• 85% of the Expressway Network
• 79% of Tap Water Access
• 75% of Metro Rail
• 71% of Port Capacity
• 69% of Railway Electrification
• 60% of 4-Lane National Highways
Infrastructure is built over decades.
But some decades build more than others.