Coins that grow on other coins
Every trade of a sprout pays 1% in its host, and 60% of it is burned
$CORDY | A2FpxDBZXsCYccjAmBghjW7qkAuCbCpucrmEYd1ypump
Colony update, signed on chain
https://t.co/AO3d7OBtw9
The host bar drops from 5 SOL to 2 SOL
Any https://t.co/6fqA8rJWU4 coin with 2 SOL behind it can now become a host
Every sprout grown on it buys it first and burns it on every trade
Register yours at https://t.co/cncjD5a36Y
DEX PAID
$CORDY is on DexScreener with its full profile
12 hosts in the colony, every curve ready, and the keeper burning around the clock
https://t.co/y7zHB4IdS2
Keeper report
12 hosts in the colony, 12 curves ready to grow on
56 keeper transactions on chain since launch, 0 failed
It samples every host, claims the fees and burns the hosts, day and night
All of it readable on chain, all of it live at https://t.co/sQTfxrnezh
Cordyceps is live and building for the long run
Today the colony opened on Solana mainnet
12 hosts are in the clearing: $CORDY, $CATE, $neet, $PAID, $TripleT, $fone, $Jimothy, $OTC, $WOJAK, $67, $Tokabu and $Percolator
Every one of them has its curve ready, so a sprout can grow on any of them right now
The keeper samples every host around the clock, claims the fees and burns the hosts
https://t.co/3ZGZgs1EG6 now shows the colony's pulse: every new host, sprout and burn scrolls by the moment it lands on chain
No roadmap promises, just a program that keeps running
More hosts every day, reply with your https://t.co/6fqA8rJp4w coin and we plant it next
The colony grew
$Jimothy, $OTC, $WOJAK and $67 are now hosts @otc_labs@WojakOnX@67coinX
10 hosts live, and every sprout grown on them burns them
Reply with your https://t.co/5M1N9TkqYW coin and we plant it next
The colony is open
Cordyceps is live on Solana mainnet
$CORDY is host no. 1, with $CATE, $neet, $PAID, $TripleT and $fone growing next to it
Grow a sprout on any of them, and every trade of it burns its host
https://t.co/sQTfxrnezh
Sprouts host sprouts
A sprout with 5 SOL worth of its host behind it becomes a host too
Its own sprouts burn it, while its trades keep burning the original
Three generations, one colony
What happens when a sprout's curve fills
At 30 SOL worth of its host it fruits into a Meteora pool, still paired with the host, never SOL
100% of that liquidity is locked forever, nobody can pull it
The pool's fees keep paying in the host coin, and 60% of them keeps burning
Any https://t.co/5M1N9TkqYW coin can be a host
5 SOL behind it and one transaction to register
Its team is not asked and cannot block it
From then on anyone can grow a sprout on it, and every trade of that sprout eats its supply
Where 1% of every trade goes
60% burns the host
25% to whoever grew the sprout
15% to the treasury
Anyone can claim and split it, and nothing stays with the program
A normal launch pairs your coin with SOL
A sprout is paired with its host
You pay in SOL, the host coin is bought first, then the sprout
Sell it and you get the host coin back
All in one transaction
Cordyceps is growing on Solana
Pick any https://t.co/6fqA8rJp4w coin with 5 SOL behind it as a host and grow a sprout on it
The sprout trades against the host, never SOL, so every buy of it buys the host first
Every trade pays 1% in the host coin
60% of it is burned, 25% goes to the sprout's creator, 15% to the treasury