Today, India takes a defining step in its civil nuclear journey, advancing the second stage of its nuclear programme.
The indigenously designed and built Prototype Fast Breeder Reactor at Kalpakkam has attained criticality.
This advanced reactor, capable of producing more fuel than it consumes, reflects the depth of our scientific capability and the strength of our engineering enterprise. It is a decisive step towards harnessing our vast thorium reserves in the third stage of the programme.
A proud moment for India. Congratulations to our scientists and engineers.
Tina Dabi’s sister, IAS Ria Dabi team uploaded a wedding invitation card on the Jal Shakti Ministry website as “proof of work completed” and still walked away with a ₹1 Crore Govt Award.
Let that sink in.
📌 Wedding card shown as project evidence
📌 No real work on the ground
📌 No geo-tagged photos
📌 No third-party verification
📌 Yet official records marked the work as “completed”
> This isn’t a clerical mistake.
> Her team uploaded a wedding card as govt work and the system approved it, rewarded it and celebrated it.
If a marriage invite can pass as infrastructure proof, then audits are fake, geo-tagging is a joke and awards are just paperwork with power backing.
This is not governance.
This is institutional corruption dressed up as excellence. 🙏
It’s both frustrating and disappointing that the current World Test Champions are playing only two 3-match Test series and not a single 4-5 Test match series in this WTC cycle.
New Zealand were handed the same fate after winning the Test mace.
Cricket Economy > Team Performance.
It is high time to fund the Kaveri engine program — an Indian initiative to develop a fully indigenous, "Make in India" aircraft engine. This is the need of the hour to boost the production of fighter jets and effectively counter India’s adversaries. 🇮🇳 #JaiHind#FundKaveriEngine
@Divcomjammu@Rameshkumarias Sir please look into the matter of electricity, common person of samba district is suffering from this issue, not getting adequate electricity in this scorching heat
Hoping for a positive response from your side
In the FY 2022–23, (JK) produced 29,931 MU of electricity and consumed 20,206 MU. This means that JK consumed less energy than it produced during that year. Still not geeting enough electricity in this scorching heat in towns like vijaypur,Samba.@dcsambaoffice@dmjammuofficial