The AI boom now hangs on one field in Ohio.
It's where SoftBank, OpenAI and Nvidia have tied themselves together so tightly that if one of them slips, the other two take the hit.
The field is in Piketon, Ohio.
For about 4 decades, it was a Cold War uranium enrichment plant. The government still owns the land, and the old plant is still being torn down and cleaned up.
On top of it, SoftBank's energy company, SB Energy, plans one of the biggest AI campuses ever proposed. That's 8 gigawatts of computing, with 9.2 gigawatts of new gas plants to power it.
OpenAI signed a 20-year lease to use it. And Nvidia will be the only chip supplier.
Here's how the 3 of them are tied together:
The landlord is SB Energy, owned by SoftBank. This month, SoftBank's credit default swaps implied almost a 1 in 3 chance the company defaults. It just lost about $7 billion in a single quarter.
The tenant is OpenAI. Last quarter it brought in about $10 billion and posted a $10.9 billion adjusted operating loss, according to the Wall Street Journal. And it can't get an investment-grade credit rating.
So who guarantees the rent?
Nvidia.
Its own filing shows up to $105 billion of guarantees for the OpenAI campus. They only go away once OpenAI earns a satisfactory credit rating.
And on Friday, Reuters reported that SEC enforcement staff are scrutinizing potential accounting issues at Nvidia.
Then it gets circular:
OpenAI put $500 million into SB Energy. So the tenant owns a piece of its own landlord.
Nvidia plans to put in $1.5 billion more. So the company guaranteeing the rent will own a piece of the landlord too.
And SoftBank owns about 13% of OpenAI.
Every one of them is propping up the other two.
So what's standing on that field so far?
Masayoshi Son was at the groundbreaking in March. But satellite images from February through July showed no graded pads and no foundations on the old plant's footprint. One tracker counted ZERO megawatts confirmed under construction.
And the timeline on paper is long:
The environmental review isn't expected to finish until January 2027. The first 800 megawatts aren't due until 2028. The utility expects to deliver grid power in 2029.
If OpenAI can't pay, Nvidia could owe up to $105 billion.
If Nvidia pulls back, the lease loses the backing that made it possible.
If SoftBank can't keep funding SB Energy, the landlord can't build.
And if the campus slips, OpenAI's compute plans slip with it, along with the valuation SoftBank is borrowing against.
That's 3 of the biggest names in AI, one 20-year lease, and a field that was still a demolition site this summer.
So which one of them falls first?