These original Victorian boards were all uplifted initially so we could insulate under the floor. Then the numbered boards were re fitted using traditional cut nails.
After this they were fully stripped back to... https://t.co/jRrgq1cPO3
We are so proud of this job carried out at London Stone showroom in Farnham, fitted out by us with Amtico Spacia Noble oak cut into herringbone blocks. Intricate curved border work, tricky but very rewarding when you see the finished result !😍
Another labour of love, whole week fitting nearly 100 m2 of Amtico signature American oak in herringbone pattern, looks amazing but really tough on the knees ! 😣
Labour of love this job.. the parquet you see was originally in another room, we uplifted it, cleaned all the bitumen of the blocks (all 2000 of them!! ) then relaid them in the new extension area.
After this we... https://t.co/FQKB9AWeiM
So proud of this job and Finally finished the traditional oak herringbone block in a 250 year old house ,just one final coat to go
From start to finish this job has taken nearly 14 days to complete
Random width Tedd Todd Hollington oak with a neutral lacquer traditionally installed by secret nailing onto batons
New Hot water under floor heating system installed underneath this beautiful floor