@GOtransit with the added morning train trip from Milton, and also from yesterday’s delay, the doors to enter the GO station from Milton are locked after 9:15am. Is there a way to have them open longer when things like this happen? I couldn’t enter the station from the overpass
@311Toronto Thanks for the update. It seems like there are 2 construction sites. The one at Poplar and Dundas St W has blocked 2 eastbound lanes down during rush hour and all other times
@311Toronto heavy traffic due to 2/3 lane closures on dundas at Auckland. Is the construction permitted to reduce 2 lanes at all hours? This is a major route
@GOtransit AC not working in the upper concourse of Kipling station as well as the elevators. To find this area, take the elevator up from the platform to the concourse that connect to the pedestrian bridge
@TSNHelp Thanks! Some feedback, with the M&Ms promotion for Super Bowl with a free month of TSN+, if the game isn’t available on TSN+, then the promotion doesn’t make sense