I sent Fast Snap Pro 3 photos of a fence job. It returned a line-item estimate priced with my rates, a shopping list from a 1,504-item catalog, and my margin. No windshield time. Try it free: https://t.co/nh51H8Pr7B
If your estimate prices 7 sheets but the supplier only sells them in 10s, you just paid for 3 sheets out of your own margin. Price the full box, bundle or roll every time.
If your estimate prices 7 sheets but the supplier only sells them in 10s, you just paid for 3 sheets out of your own margin. Price the full box, bundle or roll every time.
If your estimate says 'fixtures allowance' with one lump number, expect an argument. Give each allowance its own line and dollar amount, and write down that anything over the allowance gets billed as the difference. Get it signed before they shop.
If your estimate says 'fixtures allowance' with one lump number, expect an argument. Give each allowance its own line and dollar amount, and write down that anything over the allowance gets billed as the difference. Get it signed before they shop.
If your estimate says 'fixtures allowance' with one lump number, expect an argument. Give each allowance its own line and dollar amount, and write down that anything over the allowance gets billed as the difference. Get it signed before they shop.
The receipt isn't your material cost. Add the supply-house trip, the fuel, and the time loading the truck. If you price materials at what the receipt says, you're doing all that work for free.
October's price index was flat month over month. Don't relax.
Steel: up 32.9% year over year
Copper wire: up 25.5%
A flat index hides a volatile one. Get current prices before you lock a metal-heavy quote - that's what Fast Snap Pro gives you, photo by photo.
Fastest way to write a roofing estimate: lock the scope before touching a number. Tear-off or overlay, how many layers, decking condition. Price first and you'll end up redoing the whole thing.
Get more reviews without being awkward about it.
1. Finish the job, collect payment
2. Text one line: "Thanks! Mind leaving a quick Google review?" with the link
3. Reply to every review you get, good or bad
Takes 2 minutes. Compounds over a year.
Try an AI voice transcription app (Otter, or your phone's own dictation) on your next site walkthrough.
Talk through the damage, measurements, and client asks out loud. You get a clean text record in minutes - no typing it up later from memory.
Trimble added AI features for field crews this week: voice-driven punch walks, 360° video turned into 3D point clouds, and invoice-to-PO matching (Nov. 9).
Built for bigger jobs, but the lesson scales down too: keep field notes and cost checks in one workflow.
itemize the install even on a simple condenser swap. list the pad, the disconnect, the line set and hauling off the old unit. when every piece has its own line, nobody asks why the total is what it is.