@alpha_defense Chengalpattu and Mahabalipuram nearby i was there studying business but looking at the kalpakkam nuclear power plant from the unauthorised tower in college, i used to think i should have done Msc after Bsc physics.
I new kalpakkam was not only about energy it was something more.
@alpha_defense Hypothetical scenario
tejas mk1a flies with 73kn engine, and limited numbers are inducted for further refinement
A new twin engine jet powered by Kaveri is in production
Kaveri iterations of 85, 110kn are in full swing
Reality
10 year delay in every jet project bcz of GE414
@alpha_defense The best thing about American R&D is not having any constraint on their vision. No gsqr means unlimited possibilities and contenders.
In India we bind ourselves to our requirement and so called GSQR. just look at the project of Rustam and Kaveri, wasted potential ๐ฅฒ
@alpha_defense GE engine was never an issue before 2024, suddenly โTejas is again delayed due to enginesโ
Tbh problem is not engineering or manufacturing, problem is with our short sightedness
A 4 trillion vishwaguru canโt afford to spend 1bn dollar on its on engine project but for rafale!!
@alpha_defense I am one of the lucky ones who witnessed the Kalpakkam Nuclear Power Plant firsthand. My MBA college was very close to the nuclear power plant.
Kalpakkam plant from the restricted tower of our college๐
@alpha_defense Work on CATS warriors
Work on RUSTUM
Work on HALE
Work on Ghatak
If not fighters atleast try to induct drones in quantities as soon as possible
Par babus in MOD ye nhi hone denge๐
@alpha_defense -roll out in jan 26
-first flight aug 26
- mars trials for atleast 4 years
- contract negotiations for atleast 2 years
- taking delay of atleast 1 year
- first mk2 not making in to IAF before 2032-2033
Now the question is who is responsible GOI, BABUS, IAF or keyword warriors๐
@WaqasRashe92915@PAFFalconsPK Abe video to Asli lelo apni pak army se
Aisi hoti h real videos, thanks to pak chutiya awaam for HD videos๐๐
https://t.co/nOitBijXln