$CNPY is the fuel for Active Restaking. by @CNPYNetwork
Unlike standard staking, where your assets simply lock up value, $CNPY staking secures the entire forest. Your stake simultaneously protects the Root Layer and any Nested Chains that opt into the Shared Security pool.
Check your mail!📦🔥
The first 1,000 NANO Nodes are officially shipping this month. Your Founders Batch hardware is on its way to transform your gaming rig into a passive income powerhouse.
⚡️ Plug & Play
⚡️ ROI in 7-10 Months
⚡️ Powering AAA games via URL
@YOM_Official#YOM
Following our Q1 milestones, we’re charging into Q2 with:
AMD GPU support: Massive increase in total network compute capacity.
Unity SDK: Native support for the world's most popular game engine.
New commercial platform: A showcase of YOM infrastructure at scale.
@YOM_Official
Stop launching your NFT collection or game on a congested L1 and becoming collateral damage when a hyped drop happens. 🎮🎨
Sovereignty isn't just for infrastructure devs; it’s for creators. Build your world on Canopy. @CNPYNetwork#CanopyNetwork
Just ripped my Predictor Card!
Ready to claim instant cash prizes, free packs and more.
Welcome to Prediction Play on @upshot_cards
Your turn
https://t.co/ALGqVD9VwJ
From URL to UE5 in seconds.📲
Stop losing 80% of your players at the "Download" button. YOM is transforming social gaming by bringing AAA Unreal Engine 5 experiences directly inside Telegram, Discord, or any browser.
No friction, no 30% Store tax—just instant play.@YOM_Official
@CNPYNetwork is VM-Agnostic. This means your execution environment is modular. Want to build with:
Solidity/EVM? ✅
Rust/Wasm? ✅
Go/CosmWasm? ✅
We aren't asking you to learn our language; we’re giving you the infrastructure to run yours. Bring your dApp home to the Canopy.
🎼 And now the end is near ...
- Complete Pre-TGE Missions to allocate all boxes in RC.
- Unlock your boxes as scheduled.
- Do whatever you want at TGE.
Piece of cake! 😊
🎵 Yes it was our way.
PS. Don't forget 50 real Mini Warlord robots & secret bonuses for top participants (most referrals & completed tasks) are still up for grab.
👉 https://t.co/0TQXCjlTBr
#NexiraDAEP #TGE #Web3Gaming $NEXI
The first 1,000 NANO nodes are shipping in Q1!🔥
This isn't just hardware; it’s your ticket to the first decentralized gaming economy. Plug it in, host a stream, and earn $YOM.
Don't be the one watching the stream—be the one powering it! https://t.co/i4mOBn9Rat
@YOM_Official
Blockchain is too loud. Canopy is the quiet power. ⚡
Most networks force you to learn their specific language, navigate their bridges, and accept their congestion.
@CNPYNetwork#CanopyNetwork
@CNPYNetwork isn't just a protocol; it’s a living infrastructure where:
→Validators are the roots.
→Sub-chains are the branches.
→Users are the lifeblood.
We’re building the most durable home for decentralized apps on the planet.
Join the forest : https://t.co/jEBgM2VIs9
YOM’s Universal Pixel Streamer SDK allows devs to convert interest into gameplay instantly.
✅ No 100GB installs.
✅ No 30% App Store fees.
✅ High-fidelity UE5 in a browser.
@YOM_Official#YOM#GameDev#UE5#CloudGaming#IndieDev
In 2026, "fast" isn't enough. You need Sub-Second Finality. ⏱️
Powered by NestBFT, Canopy delivers block times of 450ms. That’s:
●Faster than a human blink.
●Fast enough for high-frequency trading.
●Smooth enough for real-world retail payments.
@CNPYNetwork#CanopyNetwork