Top Tweets for #ARbitrum
InstitutionalDeFi meets compliant privacy.
@Americanfort_io
launched privacy beta on Arbitrum—Send-to-Name via FortressNames + stealth addresses. 0 mixers. $15B+ TVL chain now has a privacy layer built for institutions. $8M seed, $AF token incoming. 🔒 #AmericanFortress #Arbitrum
1/5 🚨 $351.6M left #Bitget📷's hot wallets in a single evening — the largest crypto theft of 2026. The outflows ran across seven networks at once: #Ethereum, #XRP Ledger, #Arbitrum, #Avalanche, #Optimism, #BNB📷 Chain and #Base. The exchange spotted the unauthorised transfers at 18:31 UTC, suspended withdrawals and said its $464M protection fund covers the loss. The first public estimates put the damage at $170–190M. They counted EVM chains only: another ~$158M went out in XRP and ~$7M in #TRX.

$ARB auction rotation shows buyers absorbing below VAL at 0.21461.
🔼 Long setup
📍 Entry: 0.2085
🛑 Stop: 0.20398 (-2.2%)
🎯 TP1: 0.22066 (+5.8%)
🎯 TP2: 0.23324 (+11.9%)
⚖️ Half off at TP1 → stop to entry
#Arbitrum #AuctionTheory

@hantengri When I found out that @cz_binance was shilling it, I sold everything right away and bought ARB. #ARBITRUM +150%.
#Arbitrum’s September rally is facing a key test.
ARB is back at $0.205–$0.208 support, the same zone that previously acted as resistance.
Reclaiming $0.212 would strengthen the setup. Losing support puts $0.185 in focus.

Stable Vault #Stablecoins #DeFi #Ethereum #Polygon #Solana #BNBChain #Arbitrum #Optimism #Avalanche #Base
ethereum:0xdac17f958d2ee523a2206206994597c13d831ec7

Arbitrum Launches Priority Gas Auctions and Fast Feed Features
https://t.co/4JUAmHe8zW
#Crypto #Blockchain #NBTC #Arbitrum #Layer2 #GasAuctions #GasFees #FastFeeds

Crypto news today: Bitcoin tax updates and Arbitrum's $1 target. Did crypto tax just drop to 20%? And can Arbitrum reach $1? Check it out. #cryptonewstoday #cryptocurrencytoday #bitcoindailyupdate #arbitrum #ethereum #cryptonews #crypto #cryptotok #cryptotrading #bignew
In my opinion, $SEI will hit new highs in the future; what we are seeing now is just the beginning. If you look at how #Arbitrum rose from 0.075 to 0.25 within days following positive news, that is exactly what we can expect for Sei.
$sei
The futur is $SEI

Buradaki insanları anlamak gerçekten güç:
Ethereum 4900$ gördüğünden beri 1000$ hedefim veriyorum.
Ve bu hedefin geleceğine kendi adıma eminim...
Ama her ara yükselişte bana sallamaya geliyorlar..
1000$ geldiğinde ben bu insanlar zararda diye dalga geçtiğimde bana kibirli demek yok ama..
$ARB auction rotation shows sellers distributing above VAH at 0.22794.
🔽 Short setup
📍 Entry: 0.2291
🛑 Stop: 0.23147 (+1.0%)
🎯 TP1: 0.2226 (-2.8%)
🎯 TP2: 0.22022 (-3.9%)
⚖️ Half off at TP1 → stop to entry
#Arbitrum #AuctionTheory

#Arbitrum
0.35$⏳
0.60 ⏳
😏😏👀👀
Last Seen Hashtags on Sotwe
candidhs
Seen from United States
snapchat ()()()()()()********* filter:videos
Seen from Ireland
momsonn
Seen from United States
قنص_شوارع
Seen from Algeria
ديوت_بدوي
Seen from India
brothersister fuck
Seen from Israel
抽脸
Seen from Netherlands
PERV
Seen from United States
beurette voile
Seen from Canada
models sexs
Seen from Algeria
Trends for you
Most Popular Users

Elon Musk 
@elonmusk
241.7M followers

Barack Obama 
@barackobama
119M followers

Cristiano Ronaldo 
@cristiano
114.4M followers

Donald J. Trump 
@realdonaldtrump
111.9M followers

Narendra Modi 
@narendramodi
107.2M followers

Rihanna 
@rihanna
98.7M followers

NASA 
@nasa
92.4M followers

Justin Bieber 
@justinbieber
91.8M followers

KATY PERRY 
@katyperry
90M followers

Taylor Swift 
@taylorswift13
83.9M followers

Lady Gaga 
@ladygaga
75.4M followers

Virat Kohli 
@imvkohli
73.4M followers

Kim Kardashian 
@kimkardashian
70.9M followers

YouTube 
@youtube
68.8M followers

Neymar Jr 
@neymarjr
66.4M followers

Bill Gates 
@billgates
65.2M followers

Selena Gomez 
@selenagomez
63.1M followers

The Ellen Show
@theellenshow
62.3M followers

CNN 
@cnn
61.8M followers

X 
@x
60.7M followers





















