Top Tweets for #CKBKnowledgeBytes
However, long term holders can lock their $CKB in the Nervos DAO, and receive a portion of secondary issuance.🔒
This effectively creates a hard-capped #cryptocurrency
More info about secondary issuance can be found at 👉 https://t.co/1HFPG1R2dC
#CKBKnowledgeBytes (2/2)
@NervosNetwork Not investing in $CKB now would be a big mistake. Don't let these regrets live in your head, (state) rent free.
#CKBKnowledgeBytes
#WhyweCKB
CKB has been designed with sustainability in mind.
An ongoing cost to store data on-chain ensures the blockchain is used responsibly, minimizing state bloat that affects many chains✨
It's levied indirectly through inflation, for a seamless user experience🔥
#CKBKnowledgeBytes

CKB has been designed with sustainability in mind.
An ongoing cost to store data on-chain ensures the blockchain is used responsibly, minimizing state bloat that affects many chains✨
It's levied indirectly through inflation, for a seamless user experience🔥
#CKBKnowledgeBytes

Nervos is custom-built for interoperability✨ It can adapt to any protocol, recognize any address scheme, and support any cryptographic primitive🙌
This positions #Nervos - as well as the users, applications, and assets on it - as inherently multichain 🚀🚀🚀
#CKBKnowledgeBytes
Nervos is custom-built for interoperability✨ It can adapt to any protocol, recognise any address scheme, and support any cryptographic primitive🙌
This positions #Nervos - as well as the users, applications, and assets on it - as inherently multichain 🚀🚀🚀
#CKBKnowledgeBytes

#Nervos Network's base layer is crypto-agnostic. It can recognize the public keys (addresses) of users from any chain🙌
This means #dApps built on CKB are natively multi-chain & can access the entire crypto user base! Groundbreaking for builders & users🔥🔥
#CKBKnowledgeBytes

Construite sur la base de RISC-V (@risc_v) et sécurisée par la preuve de travail (PoW), @NervosNetwork est la L1 la plus souple et interopérable de l'industrie blockchain 🥳 #CKBKnowledgeBytes #CKB

🎉 Nervos Network, une blockchain ultra flexible! Permettant une utilisation aisée de différents protocoles, schémas d'adresse et primitives cryptographiques. #CKBKnowledgeBytes #blockchain
Nervos is custom-built for interoperability✨ It can adapt to any protocol, recognise any address scheme, and support any cryptographic primitive🙌
This positions #Nervos - as well as the users, applications, and assets on it - as inherently multichain 🚀🚀🚀
#CKBKnowledgeBytes

Nervos is custom-built for interoperability✨ It can adapt to any protocol, recognise any address scheme, and support any cryptographic primitive🙌
This positions #Nervos - as well as the users, applications, and assets on it - as inherently multichain 🚀🚀🚀
#CKBKnowledgeBytes

#Nervos Network is at the forefront of #blockchain innovation🚀
It was the first to deploy an optimistic rollup framework on top of a non-EVM chain🙌
In doing so, it offers the benefits of the account model (@GodwokenRises) and eUTXO ($CKB) in one network🔥
#CKBKnowledgeBytes

A single #blockchain layer cannot offer high security, decentralization, and scaling all at once. There will be a compromise somewhere, even if not apparent.
#Nervos solves this👇
L1⃣: Optimal security, #decentralization
L2⃣s: Multiple scaling solutions
#CKBKnowledgeBytes

@Yeti_CKB @NervosNetwork Cheers 👍 I'd like to do them all the time if @NervosNetwork think it's a good idea 👨💻
I'll probably "retrofit" the previous #CKBKnowledgeBytes installments too when I have time
The Nervos Network is made up of two layers: the base layer, which is responsible for storing transaction data, and the layer 2 scaling solutions, which are built on top of the base layer and allow for faster and cheaper transactions. #CKBknowledgebytes
Ref :

#Nervos' base layer is so generalized that it has the flexibility of a general-purpose computer⛓️
This makes it easy to update and add new capabilities and gives #developers almost unlimited scope for building the next generation of innovative applications 🔥
#CKBKnowledgeBytes

#Blockchain security is an uncompromising first principle of #Nervos Network 🔐
That is why #POW is used for #consensus on L1: it's the industry standard, has fewer security assumptions & it's harder for participants to maintain dominance long-term 🔥
#CKBKnowledgeBytes

The $CKB full node (included with Neuron wallet) is among the most lightweight of all #smartcontract platforms, boosting #decentralization of #Nervos 🚀
Anyone can run a node, join the community to learn more! ⚡
#CKBKnowledgeBytes

#Nervos' base layer is so generalized that it has the flexibility of a general-purpose computer⛓️
This makes it easy to update and add new capabilities and gives #developers almost unlimited scope for building the next generation of innovative applications 🔥
#CKBKnowledgeBytes

#Nervos Ağı geleceğe hazır yapan nedir ❓✨
Layer 1 sanal makinesi, yazılımı değil donanımı taklit eden @risc_v komut setini çalıştırır.
Bu, @Apple Geçiş Anahtarı gibi en son teknolojiyi benimsemenin hızlı ve kolay bir şekilde yapılabileceği anlamına gelir
#CKBKnowledgeBytes
What makes #Nervos Network future-proof❓✨
The Layer 1 virtual machine runs the @risc_v instruction set, which emulates hardware, not software
It means that adopting new cutting-edge technology, like @Apple Passkey, can be done quickly and easily 😎
#CKBKnowledgeBytes

One of the most common questions we see is "Why does CKB VM utilize RISC-V?"
RISC-V is an industry standard computing instruction set embodying the highest values of blockchain:
🌐Open source
🤝Community-driven
🕵���Ownerless
🙌Agnostic
Learn more here: https://t.co/XFFNuUpu1J

How does #Nervos' NC-MAX #consensus protocol improve upon #Bitcoin's Nakamoto Consensus? 🤔
✅ Improved resistance to selfish #mining
✅ Dynamic block interval to improve throughput and reliability
✅ Two-step transaction process to improve block propagation
#CKBKnowledgeBytes

Happy Lunar New Year Nervos community!
@DoberSquad watching over @NervosNetwork @GodwokenRises 😉
#Web3 #Crypto $CKB #CKBKnowledgeBytes

Trends for you
Most Popular Users

Elon Musk 
@elonmusk
240.1M followers

Barack Obama 
@barackobama
119.3M followers

Donald J. Trump 
@realdonaldtrump
111.6M followers

Cristiano Ronaldo 
@cristiano
109.1M followers

Narendra Modi 
@narendramodi
106.9M followers

Rihanna 
@rihanna
97.3M followers

NASA 
@nasa
92.1M followers

Justin Bieber 
@justinbieber
90.6M followers

KATY PERRY 
@katyperry
86.9M followers

Taylor Swift 
@taylorswift13
80.7M followers

Lady Gaga 
@ladygaga
72.3M followers

Kim Kardashian 
@kimkardashian
69.4M followers

Virat Kohli 
@imvkohli
68.7M followers

YouTube 
@youtube
68.6M followers

Bill Gates 
@billgates
63.4M followers

The Ellen Show
@theellenshow
62.5M followers

CNN 
@cnn
61.9M followers

Neymar Jr 
@neymarjr
61.3M followers

X 
@x
60.9M followers

Selena Gomez 
@selenagomez
60M followers







