Top Tweets for #CrossChainOracle
Altcoinist Review: $NGL (PRE-Launch🔥)
@Entanglefi - The Next Era of Asset-Management
Fully composable, oracle and cross-chain infrastructure layer built for institutions and Web3 ecosystems
🟣 Interoperable #RWA-s
🟣 Cross Chain DaPPs
🟣 Omnichain Stablecoins
Led by visionary @fmehrban1 (founder), with more than 60+ Partnerships secured pre-launch.✔️
EntangleFi ( $NGL ) stands at the forefront of DeFi innovation, challenging centralization norms and revolutionizing blockchain interoperability.
Overview:
Represented by the token $NGL, at its core, EntangleFi envisions a cosmos where financial interactions are
▫️ seamless ▫️ inclusive ▫️ interconnected
The project's overarching mission is to bridge the gaps in blockchain interoperability, unlocking a universe of possibilities for both institutional players and the broader Web3 ecosystem.
Liquid Vaults:
🟣 Supercharged Yield
🟣 Money Markets
🟣 Liquidity Pools
Liquid Vaults, a native application of EntangleFi, revolutionizes the usability of yield-bearing assets in the DeFi space. These innovative vaults are designed to optimize asset management, enhancing the process of earning yields and the overall utility of assets.
By simplifying cross-chain access, Liquid Vaults open new possibilities for seamless DeFi participation, marking a significant paradigm shift in liquidity dynamics and a transformative approach to DeFi asset management.
Custom Price Feeds:
Entangle offers customized price feeds tailored to specific developer needs, enhancing cost-efficiency, security, and flexibility of operations.
➡️ Flexible Data Relays
➡️ High-Cost Efficiency
Applications on any chain can receive asset prices in 3 different ways: on-demand, through user-defined time intervals, and via the threshold of change.
This flexible and custom data pricing unlocks many use cases, including the refinancing of yield assets.
🔸 Photon Messaging Protocol
🔸 Proof of Collateral system
🔸 Secured by 100 validators
🔸 Data Storage secured on the Entangle Blockchain
🔸 Low Transaction Costs
The Photon Messaging Protocol empowers
Ecosystems and DApps with fully customisable,
fast and secure cross-chain communication
across any EVM and non-EVM blockchains.
EVM Compatibility ✅
➡️Facilitates seamless interaction with Ethereum-based dApps and smart contracts.
➡️Enables Ethereum developers to easily integrate or build on EntangleFi.
Non-EVM Compatibility ✅
➡️Extends EntangleFi's reach to various blockchain networks beyond Ethereum.
➡️Amplifies opportunities for diverse cross-chain interactions and integrations.
This dual compatibility positions @EntangleFi as a versatile and comprehensive platform, bridging different blockchain technologies to foster a truly interconnected DeFi ecosystem.
Web2 Connectivity:
🟣 Seamless Web2 and Web3 Integration: @EntangleFi aims to bridge the gap between traditional Web2 systems and emerging Web3 ecosystems by authentically integrating off-chain data into blockchain applications.
Broadening Blockchain Application:
🟣 This feature significantly expands the utility of blockchain technology, enabling the incorporation of real-world data into blockchain applications, thereby diversifying and enriching the DeFi ecosystem.
Solving DeFi Dilemmas with EntangleFi:
Access and Inclusivity in Finance
➡️@EntangleFi is addressing critical challenges in DeFi by democratizing financial access and challenging centralization norms:
Enhancing Accessibility:
🟣 Simplifying DeFi processes and interfaces to make them user-friendly for a broader audience, regardless of their technical expertise.
Diverse Financial Solutions:
🟣 Offering features like Liquid Vaults to cater to various financial needs, promoting inclusivity in asset management.
Combating Centralization:
🟣 Leveraging blockchain to promote a decentralized, transparent financial system, reducing the dominance of traditional centralized finance.
$NGL Token Overview 📈
Utility: Used for transaction validation, servicing oracle fees, running keeper oracle nodes, and covering gas fees on the Entangle blockchain.
Staking: Token holders can become keepers by purchasing and staking $NGL tokens, similar to Proof of Stake validators.
Role of Validators: They work to achieve consensus among keepers and manage the submission of new blocks.
Delegation: Token holders can delegate their tokens to both keepers and validators, ensuring network efficiency and integrity.
Incentives: Keepers and validators receive rewards through various revenue streams:
▫️ Liquid Vaults Performance fees
▫️ Oracle Revenue
▫️ Liquidity Optimization Fees
Tokenomics:
Total Supply: The supply is fixed at 1 billion $NGL tokens, promoting scarcity and preserving value.
Seed Phase: Allocates 13.5% at $15M valuation, with a token price of $0.015, for early backers.
Private Sales: Private 1 with 7.9% and Private 2 with 1.25% supply, progressively priced higher for subsequent investors.
Public Sale: Offers 3% of the supply at $0.045 each, maximizing public engagement.
Staking Rewards: A substantial 33% of supply dedicated to rewarding participants and securing the network.
Vesting: Ranges from 6 to 15 months.
Team and Advisors: 12% to the team and 3% to advisors, vested to ensure alignment with EntangleFi's success.
Liquidity and Marketing: 9.6% to ensure liquid markets, and 8.4% to drive growth and brand visibility.
Community Rewards: 3% airdrop to incentivize and engage the community base.
The Pioneers Behind EntangleFi:
Team Highlights 👽
@fmehrban1 , Founder & CEO:
With an illustrious academic background from the University of Warwick and Oxford, Faisal brings a wealth of experience from the traditional finance sector, including significant roles at Barclays, JP Morgan, and Credit Suisse. His shift to DeFi indicates a strong blend of traditional finance acumen and a passion for decentralized technologies.
Slava Korolev, Co-Founder & CIO:
Armed with a Bachelor's degree in Computer Science, Slava has been deeply involved in DeFi protocols, early ICOs on Ethereum, liquidity mining, and developing incentive mechanisms, marking his footprint in the DeFi space.
Nikita Balakin, CTO:
A math and computer science graduate and winner of the VEB Blockchain Competition, Nikita has delivered projects on the $AVAX blockchain and brings a wealth of development expertise to the team.
@amiralnadi , CMO:
With nine years in marketing and a focus on research in the crypto sphere, Amir has led marketing initiatives and launched significant fintech services, bringing a dynamic approach to EntangleFi's market presence.
Aziz Kenjaev, Business Development Director:
Aziz has a rich history in finance and fintech, contributing to business development and authoring articles on finance and Web3, published on reputable platforms like @Forbes and @Yahoo Finance.
Advisory Board Insights:
@EnigmaFund , Narrative and Growth Strategy:
The fund's focus on strategy, tokenization, and growth strategy provides a strategic edge to EntangleFi's expansion and market positioning.
@shahmeerx , Technical Lead Advisor: Co-founder of Fluidity Money and backed by notable capital ventures, Shahmeer's expertise in computer science and blockchain is a valuable asset to EntangleFi.
Austin Seiberlich, Token Economy Specialist:
Austin delves into token economy design with his background in mathematics and physics, bringing innovative economic modeling to the platform.
Jeff Nowak, GTM Strategy Advisor:
Empowering early-stage founders, Jeff's experience in GTM strategy enriches EntangleFi's approach to community and ecosystem growth.
Based team…💯
The Road Ahead
🟣 Attached is the detailed roadmap that outlines their vision for the future, encompassing pivotal testnet launches, key partnerships, and groundbreaking integrations that will propel EntangleFi into new frontiers of blockchain technology.
@altcoinist Verdict
EntangleFi, a celestial force in the DeFi cosmos, harmonizes strategic tokenomics, visionary leadership, and user-centric DeFi solutions.
As @Entanglefi begins its journey, it stands poised to carve its mark as a stellar presence in both the Web3 and the institutional space.
Liquidity, Scalability, and Communication are truly resolved.🤝

1/5 🧵Řešení Cross-Chain Oracle přinášejí revoluci ve způsobu přenosu informací napříč různými blockchainovými sítěmi. Tím, že poskytují bezpečný a spolehlivý most mezi řetězci, umožňují tato řešení bezproblémovou výměnu dat a aktiv. #CrossChainOracle #RedstoneFinance

Cross-Chain Oracle Solutions are revolutionizing the way information is transferred across different blockchain networks. By providing a secure and reliable bridge between chains, these solutions enable the seamless exchange of data and assets. #CrossChainOracle #RedstoneFinance
Last Seen Hashtags on Sotwe
ย่องเย็ดแม่ยาย
Seen from Thailand
momson((((()))))***filter:native_video
Seen from Germany
susannareid
Seen from United Kingdom
Whatidid
Seen from United States
morena
Seen from Chile
manavgattravestileri
Seen from Turkey
helevier
Seen from Italy
탑
Seen from Korea
somno() *+Filter:native_video
Seen from Argentina
teenager
Seen from United States
Most Popular Users

Elon Musk 
@elonmusk
241M followers

Barack Obama 
@barackobama
119.2M followers

Cristiano Ronaldo 
@cristiano
111.8M followers

Donald J. Trump 
@realdonaldtrump
111.8M followers

Narendra Modi 
@narendramodi
107M followers

Rihanna 
@rihanna
98M followers

NASA 
@nasa
92.2M followers

Justin Bieber 
@justinbieber
91.2M followers

KATY PERRY 
@katyperry
88.3M followers

Taylor Swift 
@taylorswift13
82.2M followers

Lady Gaga 
@ladygaga
73.7M followers

Virat Kohli 
@imvkohli
70.9M followers

Kim Kardashian 
@kimkardashian
70.1M followers

YouTube 
@youtube
68.7M followers

Bill Gates 
@billgates
64.3M followers

Neymar Jr 
@neymarjr
63.8M followers

The Ellen Show
@theellenshow
62.4M followers

CNN 
@cnn
61.8M followers

Selena Gomez 
@selenagomez
61.4M followers

X 
@x
60.8M followers





