Top Tweets for #Crupdate
I hate the Tornado nerf… ⬇️🌪️
Zap ⚡️ + Tornado 🌪️ doesn’t kill Firecracker… 🧨
#ClashRoyale
#TornadoNerf
#ZapTornado
#Firecracker
#CRUpdate

#CRupdate at 6.30 hrs on 08.07.2024.
Train Services on Main line are running, however due to heavy rains and water logging between Bhandup and Nahur trains are being run by clamping and padlocking the points. Clamping completed at 06.45
Harbour line services are running normally.
#CRUpdate
मध्य रेल्वेच्या ठाणे स्थानकावरील फलाट क्रमांक ५ च्या विस्तारीकरणाचं काम यशस्वीरीत्या वेळेआधीच पूर्ण.
#Mumbaikarspirit #MumbaiLocal #ThaneLocal
#CRupdate on Special Block for Infra upgrade work at Thane station.
HISTORIC WORK ON WIDENING OF THANE STATION'S PLATFORM 5/6 COMPLETED!

@Central_Railway Congratulations 🌷💐🌷 Indian Railways.
Completed in a time frame.
Now we need a successful trail run & from tomorrow Mumbai Local train will run on time without cancelation we hope so.
Please clean the garbage to flow rainy water smoothly into Nalla and big guttar. #Crupdate
#CRupdate on Special Block for Infra upgrade work at Thane station.
HISTORIC WORK ON WIDENING OF THANE STATION's PLATFORM 5/6 COMPLETED!
• Widening of Platform 5/6 by 2-3 meters for 587 meters length
• Use of 750 pre-cast hollow blocks
• Coordination of 400 laborers, 20 teams, and 10 contractors
• Minimal disruption despite 935 train cancellations Efficient execution with zero delays!
• Work carried out along with NI work of CSMT, one of the busiest coaching terminals of Indian Railways.
* Deep appreciation to the work force for their meticulous planning, precision at work and timely execution.

#CRUpdate on Non-Interlocking work at CSMT.
The transition to the new Electronic Interlocking System will increase safety and operational efficiency.
So far, the Electronic Interlocking work is completed for all 75 points out of 75, 111 tracks out of 120, and 26 signals out of 60

#CRupdate on Special Block for Infra upgrade work at Thane station.
Platform wall gap cementing is almost complete, the gap filling work is in progress.

#CRUpdate on #SpecialBlock for Infrastructure Upgradation work. Blocks are being kept in their proper places with the help of train-mounted cranes. The work of placement is likely to be completed by midnight today.
#CRupdate on Special Block for Infra upgrade work at Thane station at 6:00 am on 1.6.2024.
* RCC BOX placement completed at Thane PF5 by 04:05 hrs.
* At 04:30 hrs, MBWT rake moved towards Kalyan end for loading of poclain and roller.
* 01 poclain and 01 roller loaded at 05:10 hrs. After loading, MBWT rake dispatched to New Mulund Goods Station at 05:30 hrs.
* 15 BRN rake with filling material arrived on the Down fast line at 05:50 hrs.
At present, the gap filling work is progressing at a fast pace.

#CRUpdate on Infrastructure Upgradation work at Thane. 100 to 200 coping block fixing work is in progress.
Platform wall being constructed in cramped space where diesel power is stable during block at Thane.

#CRUpdate on Infrastructure Upgradation work at Thane.
100 to 200 coping block fixing work is in progress. Platform wall being constructed in cramped space where diesel power is stable during block at Thane.

#CRUpdate on #SpecialBlock for Infrastructure Upgradation work.
Blocks are being kept in their proper places with the help of train mounted cranes.
The work of placement is likely to be completed by midnight today.
#CRUpdate on #SpecialBlock for Infrastructure Upgradation work.
Blocks are being kept in their proper places with the help of train mounted cranes.
The work of placement is likely to be completed by midnight today.
#CRupdate on Infrastructure Upgrade work at Thane.
130 - 140 Blocks have already been placed for widening of the platform 5/6 at Thane Station.
The work is progressing at war footing aiming to finish the infrastructure work on time.
#CRUpdate - Special Block for Infrastructure Upgradation Work.
At Thane station, with 2 round tamping and bobyn unloading, track slewing permanent way work was completed at 09:55 hrs on the Down fast line. The Up Slow line work was cleared at 07:15 hrs.

#CRUpdate on #SpecialBlock for Infrastructure Upgradation work
The track slewing work at Thane station has been completed. Tempting and blasting of the track are currently in progress. The up slow line has been declared fit at 08:04 hrs, well ahead of its scheduled time of 12:30 hrs.
However, local trains are currently running approximately 15 to 20 minutes behind schedule. It is expected that the situation will improve by 10:30 hrs.

#CRupdate
The derailed coach of the empty rake was Re-railed at 18.25 hrs
Last Seen Hashtags on Sotwe
Most Popular Users

Elon Musk 
@elonmusk
240.9M followers

Barack Obama 
@barackobama
118.8M followers

Cristiano Ronaldo 
@cristiano
114.5M followers

Donald J. Trump 
@realdonaldtrump
111.9M followers

Narendra Modi 
@narendramodi
107M followers

Rihanna 
@rihanna
98.7M followers

NASA 
@nasa
92.2M followers

Justin Bieber 
@justinbieber
91.8M followers

KATY PERRY 
@katyperry
90M followers

Taylor Swift 
@taylorswift13
84M followers

Lady Gaga 
@ladygaga
75.5M followers

Virat Kohli 
@imvkohli
73.4M followers

Kim Kardashian 
@kimkardashian
70.8M followers

YouTube 
@youtube
68.7M followers

Neymar Jr 
@neymarjr
66.4M followers

Bill Gates 
@billgates
65.2M followers

Selena Gomez 
@selenagomez
63.1M followers

The Ellen Show
@theellenshow
62.2M followers

CNN 
@cnn
61.7M followers

X 
@x
60.6M followers

























