Top Tweets for #layerbank
@LayerBankFi A question many people are asking:
With the Snap campaign on Cookie being stopped, does this affect the rewards for content creators of #Layerbank?
Today I checked and saw that I got a new badges:
#6 Loyalty on @LayerBankFi.
Not really sure what it means yet, but it still feels good 😄
Staying bullish and continuing to wait for the next updates from #LayerBank 🚀
@cookiedotfun

📣 PRESALE ALERT 📣
🔹 LayerBank Presale $ULAB
🔸 @LayerBankFi The LayerBank Presale is here! You can buy $ULAB tokens on the Binance Smart Chain.
👉Full details: https://t.co/xsOsqW0NAF
#LayerBank #DeFi #BSC #CryptoPresale #Web3

I am super excited in this project . @LayerBankFi public sale coming soon. 2 days left .
#cookierunkingdom
#layerbank

Movers! The airdrop we have all been waiting for has finally been announced 🥳
Keep your eyes and notifications open for upcoming details soon 👀
Christmas / New Year maybe coming sooner than expected!
Gmove gLayerbank
#Layerbank #Movement #DeFi
Airdrop soon on Movement. Keep your eyes open.
Move is for money. LayerBank is money in motion.
Unlock yield on LineaBuild.
Deposit, borrow, and earn $LAB rewards.
Your on-chain bank is live.
👉 https://t.co/WFDUGBgTKM
#DeFi #LayerBank

@LayerBankFi is building a permissionless, cross-chain money market — unified liquidity, non-custodial rami lending, and real DeFi composability. Clean design, strong fundamentals, and growing traction.
#LayerBank #DeFi #Web3 #CookieDAO @cookiedotfun
@LayerBankFi public sale 👀
Presale trên Base mới ~2.4%, Movement còn sớm hơn nữa.
Giá public $0.2 (FDV 20M , target launch 25M), phân bổ pro-rata, dư thì refund → khá fair.
#LayerBank không phải vẽ bánh, đã có sản phẩm DeFi lending chạy thật.
Base + Movement là combo mình thích theo dõi giai đoạn này.
Không phải lời khuyên đầu tư, chỉ là một kèo mình thấy còn rất sớm 🤝
@cookiedotfun

大家都觉得现有的借贷市场有点受限,主要是只能在单一链上操作,灵活性差了点。
#LayerBank 之前和 LayerZero 合作,就是让 $ULAB 代币支持跨链流动,意味着你可以在不同的区块链之间借贷,不再局限于单一链。这种跨链的功能让借贷变得更简单、更方便。
简而言之,#LayerBank 通过那次合作,能让用户在多个链上进行借贷,不受链的限制,提升了流动性和效率。
对于普通用户来说,这意味着你可以更自由地选择借贷的方式,不用担心链的限制,操作起来也更方便。
总的来说,这个合作让 #LayerBank 的借贷产品变得更强大,以后有更多的可能性,值得关注。
#BTCFi #Rootstock #DeFi #LayerBank #Omnichain #Cookie #CookieSnaps @cookiedotfun @LayerBankFi
$ULAB public sale is your clean entry into a dual-chain project built for real liquidity, not short-term hype. Don’t miss it!
@LayerBankFi #ULAB #LayerBank
The $ULAB public sale opens in less than 24 hours.
Dual-chain on @movement_xyz & @base. Limited allocation. Fully unlocked at TGE.
Key details
• Availability: Dec 17, 11:00 UTC.
• Allocation: 1,000,000 $ULAB (1% of supply)
• Target raise: $200,000
• Valuation: $20M sale FDV → $25M launch target
• Vesting: 100% unlocked at TGE
• Settlement: $MOVE on Movement, $USDC on Base
$ULAB is designed to coordinate liquidity across chains, not to optimize short-term distribution games.
This sale is simply the cleanest entry point.
More info: https://t.co/T9NbRMyQmr
Public sale: https://t.co/xVXTFf2se2
说实话,现在一看到公开发售,很多人下意识就想划走,毕竟见过太多卖完就没后续的项目了。
#LayerBank 把 $ULAB 定位成 Movement 生态里的第一个核心代币,它不是单独出来卖币,而是想跟整个生态一起走。再加上这次是双链发售,放在 Movement 和 Base 上,。
这种设计至少少了一层折腾成本,你在哪条链上用得多,就在哪参与,不需要为了买个代币再去学一堆新操作。
卖得好不好、后面生态能不能撑起来,还得看执行。
#LayerBankFi #DeFi #LayerBank #ULAB #Cookie #CookieSnaps @cookiedotfun @LayerBankFi
最近市场波动加大,项目的第一件事不是收益,而是有没有出风险事故。
因为行情一差,很多协议的真实水平就藏不住了。
#LayerBank 从 2023 年到现在,不管牛熊切换、流动性紧不紧,它没有出现坏账。
他们的抵押率、清算参数都偏保守,不追求短期 TVL 增长。
很多项目为了数据好看,把风险拉满,一遇到剧烈波动就容易出问题。
#LayerBank 明显是优先考虑系统稳定,而不是排行榜。
再说代币这块。
$ULAB 的经济模型已经公开,总量 1 亿,主要作用是治理和提升收益效率,同时会和 $MOVE 生态有联动。
不是那种只用来发奖励、很快被抛售的设计。
测试网已经上线,质押、铸造 xULAB、做任务的流程都能实际体验。
项目刚完成 230 万美元融资,之前还跑过 400 多天的积分计划,
这个时间点公布代币模型,逻辑上是为 TGE 和空投做准备。
从产品层面看,#LayerBank 覆盖链多,市场数量也多,
支持借贷、循环、效率模式这些基础功能,更像是一个长期运营的链上资金工具,而不是短期热点项目。
#layerbank #Omnichain #Cookie #CookieSnaps @cookiedotfun @LayerBankFi

DAY 56
On this segment 🙏
Let's talk about @LayerBankFi
The journey hasn't been easy, but we keep showing up, preaching, and spreading the Gospel of #Layerbank as we stay positioned and ready for the rise of $ULAB.
GM CT.
DAY 55
On this segment🙏
Let's talk about @LayerBankFi
On today's segment, we are going to be playing a free role and at the same time touching some grass with #Layerbank
In every activity of the day, don't forget to read more about the Tokenomics and launch of $ULAB, the governance token, supply, and lock.
Glayerbank something huge is definitely coming
Stay positive
Happy weekend with @cookiedotfun

看到 #LayerBank 公布了 $ULAB 的代币经济模型,这代币会在Movement链上发行。
作为Move联盟的创始成员,@LayerBankFi 做的是跨链资金市场,核心优势就是提升资金使用效率。
协议会拿一部分收入回购MOVE,ULAB和$MOVE 配对能获取额外收益,同时还会开启社区销售,给社区成员发放空投,整体和Movement生态深度绑定。
具体规则可以去看原文了解
#LayerBankFi #DeFi #LayerBank #ULAB #Cookie #CookieSnaps @cookiedotfun @LayerBankFi

刚看到 #LayerBank 把 $ULAB 正式公布了,这次信息给得还算完整。
总量 1 亿枚,首发链选在 Movement L1。官方给的理由是 Move 体系的安全性、性能和现在的开发者生态,这个选择不算意外,#LayerBank 之前就和 Movement 走得比较近。
$ULAB 的定位很明确,就是治理代币,设计目标是长期协议增长和流动性支持,不是短期用途型代币。
上线就直接用 ve 机制。
ULAB 做 LP 后锁仓可以换 xULAB,拿协议激励加成;
再和 $MOVE 组合还能多一层收益。
公售这块给了 1%,也就是 100 万枚,面向社区用户,具体时间和规则还没公布。大家等吧!
#layerbank #Omnichain #Cookie #CookieSnaps @cookiedotfun @LayerBankFi

昨现在新项目很多,代币一出就看不懂,什么模型、什么分配,到底该看啥。先看清楚规则写不写人话,再看是不是打算长期干。
看到 #LayerBank $ULAB 的代币方案。
总量 1 亿枚,发在 Movement 的 L1 上,定位就是协议治理用,不是那种一天拉完就不管的思路,核心还是围着协议增长、流动性和用户激励转。
选 Movement 是因为语言安全性高,链性能够用,更重要的是那边社区和 builder 氛围比较强,这点对一个长期跑借贷协议的项目来说很现实。不是只看技术,更多是看人和生态。
想拿更多权益,就把 $ULAB 做 LP 锁起来,换xULAB,能吃加成;再和 $MOVE 配对,还有额外收益;LP 初始流动性会和联盟伙伴一起铺,不是完全放养。
现在测试网已经开了,想提前摸流程的可以去试一试。
社区公售也会有,但只拿出 1% 的总量,给早期支持的人,时间和细节还没公布。
#BTCFi #Rootstock #DeFi #LayerBank #Omnichain #Cookie #CookieSnaps @cookiedotfun @LayerBankFi

DAY 55
On this segment🙏
Let's talk about @LayerBankFi
On today's segment, we are going to be playing a free role and at the same time touching some grass with #Layerbank
In every activity of the day, don't forget to read more about the Tokenomics and launch of $ULAB, the governance token, supply, and lock.
Glayerbank something huge is definitely coming
Stay positive
Happy weekend with @cookiedotfun

DAY 54
On this segment🙏
Let's talk about @LayerBankFi
You can feel the excitement around #Layerbank that they're definitely going to have a great move.
First of all achieving a milestone of 682,993 participants on the L.point share, after which a $2.3m Pre-seed round, and now the release of the Tokenomics show a Total supply of 100,000,000 in $ULAB on the @movement_xyz L1 chain.
That's a clear vision of what to expect from Glayerbank smooth and clean.
Happy season of love with @cookiedotfun

Linked EVM+Movement wallets in @LayerBankFi L.Points merged, credit updated. Supply ETH on Linea, borrow USDC on Scroll, loop stUSD into Plume, lock xULAB for 3x boosts at $ULAB TGE #LayerBank #DeFi #Omnichain
Quick guide I ran this week to prep for $ULAB on #Movement
• Link EVM + Movement wallets inside @LayerBankFi my L.Points merged across chains and the on-chain credit profile updated instantly. With 682,993 users and 386B points closed on Dec 9, that history matters for future LTVs
• Supply ETH on Linea, borrow USDC on Scroll, deploy on Base all from one dashboard. No bridges, no wrappers, no waiting for finality. It legit feels like one account across 17+ networks
• Loop stUSD into the RWA vaults on Plume. Pendle PTs have been printing 50 70% for me while BTC collateral stays native via Threshold
• When $ULAB TGE hits, lock xULAB for 3x boosts. OFT-native mobility means the incentive layer travels with you. Total supply 100M, launch on Movement L1
If you haven’t linked wallets yet, do it now and set your positions on #LayerBank #DeFi #Omnichain. Who’s locking early and letting the credit layer do the work?

DAY 54
On this segment🙏
Let's talk about @LayerBankFi
You can feel the excitement around #Layerbank that they're definitely going to have a great move.
First of all achieving a milestone of 682,993 participants on the L.point share, after which a $2.3m Pre-seed round, and now the release of the Tokenomics show a Total supply of 100,000,000 in $ULAB on the @movement_xyz L1 chain.
That's a clear vision of what to expect from Glayerbank smooth and clean.
Happy season of love with @cookiedotfun

DAY 53
On this segment🙏
Let's talk about @LayerBankFi
It was a great session with the @moveindustries team on their space discussing the Move alliance road map.
Where I listen to the #Layerbank team officially announced that they're on 4 different chain platforms, but the movement chain is the first non-EVM chain platform, and also mentioned the tge coming immediately after the community pre-sale.
That's a clear vision and mission of a project taking the lead in the lending and borrowing protocol of the ecosystem.
We keep building as we await the coming of $ULAB, make sure you're testing out the testnet supplying and locking.
Stay bullish on @cookiedotfun
Gmove

LayerBank connects many blockchains so money can move easily.
We can save, borrow, and earn in one place.
No stress, no confusion.
Just simple online money tools for everyone. 😊
#LayerBank #Crypto #DeFi #FinanceMadeEasy #Web3Gaming
@LayerBankFi @cookie3

Last Seen Hashtags on Sotwe
森沢かな
Seen from Indonesia
นัดเย็ดสมุทรสาคร
Seen from Thailand
bbwgranny
Seen from Turkey
outdoorbabesx
Seen from Pakistan
monkeyappwinsfull
Seen from United States
çanakkale merkez
Seen from Turkey
نيج_عراقية
lesbi indo
Seen from Indonesia
OpenRafahCrossing
Seen from United States
teenager
Seen from United Kingdom
Most Popular Users

Elon Musk 
@elonmusk
241.1M followers

Barack Obama 
@barackobama
119.1M followers

Cristiano Ronaldo 
@cristiano
112.4M followers

Donald J. Trump 
@realdonaldtrump
111.8M followers

Narendra Modi 
@narendramodi
107.1M followers

Rihanna 
@rihanna
98.1M followers

NASA 
@nasa
92.2M followers

Justin Bieber 
@justinbieber
91.3M followers

KATY PERRY 
@katyperry
88.7M followers

Taylor Swift 
@taylorswift13
82.6M followers

Lady Gaga 
@ladygaga
74.1M followers

Virat Kohli 
@imvkohli
71.5M followers

Kim Kardashian 
@kimkardashian
70.3M followers

YouTube 
@youtube
68.7M followers

Bill Gates 
@billgates
64.5M followers

Neymar Jr 
@neymarjr
64.4M followers

The Ellen Show
@theellenshow
62.4M followers

CNN 
@cnn
61.8M followers

Selena Gomez 
@selenagomez
61.8M followers

X 
@x
60.8M followers













