HOME OF THE UAAP ๐
Take a look at the 3D walkthrough of the 6,000 seater UAAP Arena.
The construction is scheduled to be completed come UAAP Season 89. Shaped like the infinity โพ๏ธ symbol, the arena represents the 8 UAAP member schools.
#UAAPxAkari#HomeOfTheUAAP
TAGUIG GHOST INFRA PROJECTS UPDATE # 3:
Ang daming damning (evidence).
The plot thickens.
The list lengthens.
The case strengthens.
Kung merong โshoot sa baldeโ, meron ding
SHOOT SA KALDERO.