@srdencomumbaicr@drmmumbaicr@RailwaySeva 2. The opposite side should also have the same open top section with NO advertising banners which will allow an escape of hot air from both sides.
@RailwaySeva @Central_Railway
What is the reason to cover the bridge with for all side with out enough ventilation.?
This Covering is causing little to no ventilation and is a serious health hazard.
Location : Kalyan railway station Bigger foot over bridge
@srdencomumbaicr@drmmumbaicr@RailwaySeva Thanks for the response.
Attached is the video recorded on Saturday 13th June 2026
Few suggestions:
1. The open locations kept for ventilation at one side are covered with Advertising Boards causing hindrance in ventilation
Those should be removed
@MSEDCL , Kalyan west ke shivaji chauk aur Valipeer circul me light ka bada issues ho raha hai. Bar bar cable jal rahi ya load badh kar transfer me problem ho raha aur ghanto tak light ja rahi hai. Public bar bar complaint kar rahi fir bhi problem solve kyu nahi ho raha hai.
@DrSEShinde@MeBalyaMama :
This is New Bridge of Kalyan Junction Railway Station, There is no single fan on this bridge and an improper ventilation, This is summer season, and we as a daily commuters of local facing inconvenience, Humbly requesting you as MP of this Constituency, please facilitate us with proper fans and ventilation.
Thank you
CC : @AshwiniVaishnaw@RailMinIndia@RailwaySeva
Please find the attached video
@MSEDCL
There is No light since 1pm, its been 2 hours.
No prior message and intimation.
Also whenever we call mseb valipeer road branch contact number “88796 26345” of C ward it’s always out of network during power outage.
There has been a power outage in our area since 12:00 PM today. Till now, no electricity supply has been restored, and there has been no official communication from MSEDCL regarding the cause of the outage or the expected time of restoration.
Provide an immediate update on the status of the outage and estimated restoration time.
Ensure that proper alerts and SMS notifications are sent to consumers in future to avoid such uncertainty.
Take urgent action to restore power supply at the earliest.
#poweroutage#msedcl
Today at around 10:00 AM, the Electric Distribution Box of Building 01 (Sarvoday Residency) collapsed due to severe rusting.
As a precautionary measure, the electricity supply to Building 01 has been disconnected by MSEB. At present, the building is completely without power.