@GaboAir Me encanta ... me acuerdo de chico viendo pasar los aviones decía ... de grande voy a ser avionero ... el curso de piloto lo tengo pendiente ...
Ground testing of the DarkAero 1 control system has been one of the outstanding milestones before flight testing. Through ground testing, the original carbon fiber version was found to have too much compliance under load.
To maintain a tight space claim and increase overall system rigidity, a welded steel version was conceived to replace the original carbon fiber design. Fabrication of welded assemblies began with designing and machining welding jigs to ensure proper assembly geometry with minimal heat distortion. Other than material and dimensional updates from the previous carbon fiber version of the flap control system, one of the largest changes is the actuation bellcranks. An electric actuator is planned to be used to actuate the new flap control system which is different from the originally planned manual actuation mechanism. This drove a corresponding design change in the supporting hardpoints as the reaction load is imparted into the airframe in a different location, and the mechanism required for the previous flap detent features is no longer required.
In parallel, fabrication continued with updates to the flap hinge supporting structure in the airframe. The split flaps on the DarkAero 1 are attached to the lower wing skin with five separate sections of piano hinge, and each flap is actuated via a single pushrod located at the root end of the flap.
With the actuation load being applied only on the root end of the flap, the root end piano hinge section is loaded differently than the other hinges. The aerodynamic hinge moment on the flap is reacted only by the flap actuation pushrod at the root of the flap, which causes the load vector on the root hinge to act partially in the opposite direction as the flap lift loads. This loading direction forces the lower wing skin away from the rest of the wing assembly.
A bench test was quickly fabricated to simulate the flap actuation and loading condition on a structural joint configuration similar to the wing. This allowed potential structural failure modes to be studied without damaging the actual wing assembly. The results of the bench test drove hinge support structural updates on the wing that included multiple wet layups, precured shim additions, and hinge section reinstallation.
Further design changes and testing are currently underway!
PRESS RELEASE
Nine years after the sinking of the #ARASanJuan: “They fulfilled their duty. We hope the judges will fulfill theirs.”
This Sunday, November 15, marks nine years since the sinking of the ARA San Juan submarine. Its 44 crew members lost their lives in the South Atlantic while carrying out their duty.
From that day forward, the families never stopped demanding truth and justice. In 2026, after nine years of struggle, the oral trial was held before the Federal Criminal Oral Court in Santa Cruz, in Río Gallegos. There was only one conviction: former Navy Captain Claudio Javier Villamide, former Commander of the Submarine Force, received a three-year suspended prison sentence. The other three former senior Navy officers were acquitted.
The sentence is insufficient, but the trial established something that no one can deny:
It was NOT an accident.
It was NOT “the perfect storm.”
It was NOT the crew's fault.
It was preventable. The ARA San Juan was sent to sea in poor condition.
For nine years, there were attempts to portray the tragedy as an unavoidable disaster for which no one was responsible. The trial demonstrated otherwise: decisions were made, there was a chain of command, and the State bore responsibility for sending 44 people out to sea aboard a vessel that was not in suitable condition.
For this reason, the plaintiffs have appealed the ruling before the Federal Court of Criminal Cassation, challenging both the acquittals and the sentence imposed, which bears no relation to the gravity of the loss of 44 lives. The appeal is currently pending.
Furthermore, a complaint remains pending before the Inter-American Commission on Human Rights (IACHR) concerning the surveillance orders issued in the case involving the espionage carried out against the crew members' families. The families not only lost their loved ones; they were also spied on while demanding justice.
The 44 crew members fulfilled their duty. We hope the judges will fulfill theirs.
WE WANT JUSTICE.
Dr. Valeria Carreras – Dr. Lorena Arias Attorneys representing the plaintiffs – Families of the ARA San Juan crew
Before flight testing, one of the remaining ground test objectives for the DarkAero 1 prototype was to tune the main landing gear shock damping to slow shock rebound during hard landings. Working towards this objective, we built a dedicated drop test rig to allow rapid testing of the main gear in a controlled manner. The rig was designed to also work for landing gear systems beyond the DarkAero 1 program. For more information on the remaining milestones, check out the Aircraft page on the DarkAero website! https://t.co/O5At4qlqHV
Check out Part 2 in our @CompositesWrld series on the multi-pi joint structures used in the center spar of the DarkAero 1 prototype. We take a closer look at how we built cost-effective molds for these structures while still producing a high-quality, tight-tolerance result. https://t.co/pkefO9Vnaj