@priyaJasTweet4u@krishnabgowda Like how Phase 1 began in 2K7 and completed in 2k17. Phase 2 began in 2k17, and should complete fully in 2027 with only small negligible portions like these (veerannapalya and kempapura stations in between)
@priyaJasTweet4u@krishnabgowda Until the Kempapura and Veerannapalaya stns get ready, let the metro trains skip these stns, provided the track laying n 3rd rail electrification would be done by then. We need continuous metro from CSB to KIAL by the end of 2027 at least
@AviationAll_ Had Tata merged AIX with AIC, instead of this one, we could hv had a Great Triopoly of IGO-VTI-AIC. Instead, we hv now ended up with the IGO-AIC Duopoly!!!
@Lord_Shankar1@bengalurupost1 AFCONS is nothing but a Shithole, as expected from various projects they have taken part, throughout India. They hv TERRIBLY Delayed every project they hv taken up
@virperitus@naveenkopparam Dravidian words have roots from this language only. Manuscripts were written only in 3 languages:
1) Sanskrit
2) Prakrit
3) Tamil
@vettipayya@vasudevg Mid 2027 is EASILY possible, if you push the work speed. 10 months is easily enough. At first, the K R Puram to Kodibeesanahalli will open in Dec 2026. SNC is going at a Rocket Speed. Afcons is still Crying now, but 10 mo is enough for their speed.
@naveenkopparam@HospitalsApollo Apollo Hospitals KILLED THESE PPL:
1) Mandolin U Shrinivas
2) Former TN CM J Jayalalitha
(And this could be the reason too ig)