Scheduled (Jun 24, 2024, 10:00 BST): We will be upgrading the UPS batteries backup system at this site to give extended runtime. This should cause no interruption however services fed from this site should be treated as at risk and wi… https://t.co/RUsbCIJRYO
Scheduled (Jun 20, 2024, 20:00 BST): We have been informed our a planned power interruption to our Bournemouth 2 site. Although battery backup should last the duration of the power outage, services from this site will be classed at ri… https://t.co/KkSAg0yo9N
Identified: We are aware of an issue with Christchurch exchange backhaul, customers connected to Christchurch will have lost service.
This has been escalated to the supplier to investigate the cause of the outage. Updates to follow. https://t.co/LaYI0t2Ohw
Scheduled (May 28, 2024, 10:00 BST): DC06 Datacenter will undergo a full load generator test on the below date.
This will involve simulation of a power failure to the site.
There will be no planned service impact, this is an advisor… https://t.co/lzqdjQNl02
Scheduled (May 28, 2024, 08:30 BST): During this window a third party will be carrying out maintenance work to a power supply impacting the primary backhaul to Kimmeridge, Tyneham, Church Knowle and the surrounding areas. Connectivity… https://t.co/6knmwH3Ihh
Scheduled (May 23, 2024, 20:00 BST): Due to expansion of equipment we will be replacing the UPS battery backup system at DC07 / PAN site, to give higher capacity and extended runtime. This should cause no interruption as all equipment… https://t.co/5W9hur3atS