@GandhiArekapudi@KTRTRS@GHMCOnline@CommissionrGHMC @GadwalvijayaTRS
Sir, need your intervention. I am a resident of Road no. 14 in Deepthisri Nagar (Seri Lingampally division). All of the road number 14 ,has been re-layed except for the last 100 meter stretch.
I had raised this multiple times on Twitter too, but no luck. Hope something will be done to look at the problems with Roads and Drainage system in Deepthisri Nagar. I sent multiple emails to the GHMC officials. Not sure, how could a common man get his problem resolved.
This has been raised with GHMC officials at Seri Lingampally multiple times with zero luck. This road was dug up in December 2020 and not been relayed. Before the dugup this road was good to commute, for re-laying they dugup but never completed. This creates lot of inconvenience
@GandhiArekapudi@KTRTRS@GHMCOnline@CommissionrGHMC @GadwalvijayaTRS
Sir, need your intervention. I am a resident of Road no. 14 in Deepthisri Nagar (Seri Lingampally division). All of the road number 14 ,has been re-layed except for the last 100 meter stretch.
I had raised this multiple times on Twitter too, but no luck. Hope something will be done to look at the problems with Roads and Drainage system in Deepthisri Nagar. I sent multiple emails to the GHMC officials. Not sure, how could a common man get his problem resolved.
This has been raised with GHMC officials at Seri Lingampally multiple times with zero luck. This road was dug up in December 2020 and not been relayed. Before the dugup this road was good to commute, for re-laying they dugup but never completed. This creates lot of inconvenience
The dug up road not only creates inconvenience to commuters but also is a source of high dust pollution. This dust pollution is making our lives pathetic.
I sent emails to [email protected],
[email protected] and followed up with AE multiple times. Request your assistance pls
Later, they mentioned that this stretch also will be re-done and started digging up the existing road. Now the contractor is not re-laying the road on this stretch and is unreachable.
Pics are attached on the current situation, which creates massive inconvenience to us.
@KTRTRS@CommissionrGHMC@GHMCOnline Sir, need your intervention. I am a resident of Road no. 14 in Deepthisri Nagar (Seri Lingampally division). All of the road number 14 ,has been re-layed except for the last 100 meter stretch.
The dug up road not only creates inconvenience to commuters but also is a source of high dust pollution. This dust pollution is making our lives pathetic.
I sent emails to [email protected],
[email protected] and followed up with AE multiple times. Request your assistance pls
@KTRTRS@CommissionrGHMC@GHMCOnline Sir, need your intervention. I am a resident of Road no. 14 in Deepthisri Nagar (Seri Lingampally division). All of the road number 14 ,has been re-layed except for the last 100 meter stretch.
Later, they mentioned that this stretch also will be re-done and started digging up the existing road. Now the contractor is not re-laying the road on this stretch and is unreachable.
Pics are attached on the current situation, which creates massive inconvenience to us.
💡At #Nullcon2020, you have an opportunity to network and listen to great analysis & insights by thought leaders in the #security domain💭
Here are some of the global leaders who will speak at #Nullcon.
💸Register👉https://t.co/FHgYNDFFEy
🚨Limited seats available🚨
#InfoSec
Hey Community Students,
Our next 'Studnet Pass' quota for @nullcon 2020 will open on 1st Dec. 2019, with Pre-con rates. | Caution: have limited tickets in that also, so please book ur seat asap before it reached to the limit.
#Nullcon2020#StudentPass
Congratulations and thanks to all the wonderful leads from
@nullhyd team who are always enthusiastic. Way to go folks, all the best!. So happy to be a little role in your journey.
@pavanw3b@NahtnahS@vhssunny1 and Mahesh. #nullhyd100