a delay is not a defeat for them, and it is not a win for us YET.
postponed ≠ rejected, let us all continue to keep speaking out until it is REJECTED #RejectPaxSilica
hiya hiya pa na nakaabot ung rally natin sa news sa ibang bansa, ano nakakahiya ron? tangina niyo kinakahiya niyo ipaglaban ung pilipinas palibhasa di kayo maapektuhan kapag pinatayo ung pax silica e hahah
Those who are expressing opposition towards Pax Silica site do not reject the installation of the industry, but rather on the site location itself. (A thread)
1. The site doesn’t satisfy the 80 million L per day surface runoff requirement ontop of the 750 MW energy requirement.