#DeccanGold has been recognised as Runner-Up in ASSOCHAM's “Excellence in Mineral Discovery and Exploration” category for the discovery of nickel, copper and PGE mineralisation at the Bhalukona Project, Chhattisgarh.
A proud milestone in our critical minerals journey.
🔴TRIDENT TECHLAB FY26 ANNUAL RESULTS. H2FY26 RESULTS. Rs.231 was at 21p/e. Now 66.5x🔴
Disaster strikes again! At least last time, there was no loss. It was only topline collapse in H1Fy25.
After recovering over next 1 year, now reporting another topline collapse together with LOSS?😡
This is turning out to be a horrendous stock which was priced only Rs.35 at 12 P/e by promoters because they found little value in the small business of “selling foreign engineering software, as a local dealer”!
From 35 to>Rs.1500 and crashed to Rs.150 and when everyone thought the company is back on track, all 4 wheels goes bust.
H2 FY26 Vs.H1 FY26
REV:Rs. 34Cr Rs. Vs Rs. 64Cr😡
PAT:Rs.(-)5.3 Cr Vs Rs. 11.4Cr😡
(May Compare with H2FY25 Rev=Rs.56 Cr & PAT=Rs. 8Cr )
FY26 Vs FY25
REV:Rs. 98.4Cr Vs Rs. 77.3Cr👍
PAT:Rs. 6Cr Vs Rs. 11.5Cr😡
Employee costs can not be manged incrementally, if you are scaling? But where is the scale, when topline itself is down??? Better to LAY OFF ALL THE NEW EMPLOYEES, TOMORROW!
TRIDENT TECHLAB SME IPO was in DEC 2023 at Rs. 35 at 12 p/e .
Deccan Gold Mines: Expansion Plans & Future Gold, Nickel Production Targets 🏭💰 | MCap 2,388.64 Cr
- Jonnagiri mine (India) operational at 1000 tonnes/day, costing ₹350-400 Cr.
- Altyn Tor mine (Kyrgyzstan, 60% owned) starts full production by Aug 2026: 160kg (FY2027), 300-350kg (FY2028).
- FY2027 targets: 600kg gold from Jonnagiri (₹900 Cr revenue, 75% EBITDA).
- Kyrgyzstan project PAT margins: 30% now, 40-45% at peak.
- Bhalukona project (India) has 70,000-80,000 tonnes nickel equivalent potential, needs ₹400 Cr capex.
- By 2030: 1 ton/year gold from Jonnagiri, 700-800kg from Altyn Tor, plus India’s first Nickel-Copper-PGE mine.
- Gold sales: Refined 999 bars in India, doré bars to National Bank in Kyrgyzstan.
- Rights issue raised ₹315 Cr; debt-free since March 2026.
- Exploring lithium, tantalum, copper-gold (Mozambique) and tungsten (Spain).
- Future funding: ₹400-500 Cr for Bhalukona/expansion, potential Geomysore IPO.
Disc: Information provided in this tweet can be inaccurate, verify through the source in reply before making any investment decision.
Preview 👇 (First 4 out of 38 pages)
Apollo Micro Systems Ltd Q4 FY26
On the development front, the company completed blast trials for its indigenously developed Limpet Mines for the Indian Navy. Additionally, it secured its first official international export order valued at ₹114 crore for complex avionics systems.
Read more - https://t.co/ikzYhdNBdu