Everyone’s blaming data centers for rising power bills.
Problem: most aren’t even built yet (aren't added to rates yet).
Meanwhile, natural gas costs mostly get passed straight through, instantly.
That’s the real reason your bill is up.
🚨 One of the world's largest open pit copper mines, produces about 300,000 tonnes of copper annually, roughly 4% of global refined copper supply has shut down 😳
.@Google taps @XcelEnergyMN to supply data center with 1200 MW wind, 200 MW solar and 300 MW / 30 GWh @FormEnergyInc iron-air batteries, through new BYONCE (bring your own new clean electricity) tariff construct.
https://t.co/iW5Xx4FZnx Google will also pay for all grid needed upgrades.
Fun day of announcements at @ScaleMicrogrids:
- We acquired Reload, a powered land dev with great sites and an amazing team.
- We're well into construction of a multi-hundred MW off-grid (for now) system for a hyperscaler. Power will flow soon.
- We're geared up to do GWs.
Sharing this course because
1. it looks interesting
2. I learned finance a decade ago from free online MBA courses (esp U Michigan on Coursera), and it has been great for my career.
Young/early career folks have so many great resources to come up the knowledge ladder.
Took it a step further. Here's every single 1-year growth period ever (within the EIA 861 dataset), for all utilities.
Same result. Demand growth within a 12 month period has never meaningfully correlated with price growth within that same 12 month period.
Things to do next:
1) could demand growth in one year lead to price growth in the following year(s)?
2) what about 5 year periods
Multiple roles open @podium_automate on our electrical and software teams in NYC. Looking for early-career engineers to jump in and have immediate impact as we scale.
Come live in the greatest city in the world and build products that make hardware less hard 🦾
This new letter from OpenAI has many specific ideas for getting more generation capacity online faster. Several double down on Biden Admin initiatives, some of which have been undone by this Admin.
Exceptional work from the @podium_automate team.
Over the last year, @jamie_niu and co have quietly built the software-defined factory for industrial control panels, and are shipping to a rapidly growing customer base. Industrial capacity runs through the control panel.
It’s wild how this whole industry just needed a little new demand to get innovative and muscular.
We were all just fucking grinding in a drought for 15 years, gasping for drops of sustenance.
Now people want our shit for the first time and it’s crazy.
Let’s fucking go.
Buckle up, kids. @ENERGY is directing @FERC to assume jurisdiction over the interconnection of data center loads and others >20 MWs to the transmission grid, superseding state authorities in this realm.
(And fwiw, that is probably not the worst idea!)
🚨 Historic News for Nuclear Energy! 🚨
The U.S. Nuclear Regulatory Commission (NRC) officially reauthorized the operating license for the Palisades Nuclear Plant—the first time in U.S. history a previously shutdown nuclear facility has been approved for restart.
This monumental achievement sets a precedent for clean energy innovation and proves what’s possible with vision, dedication, and perseverance.
Palisades is now on track to return over 800 MW of carbon-free baseload power to Michigan’s grid—enough to power 800,000+ homes. A huge win for energy reliability, sustainability, and our future.
👏 Congratulations to the Palisades team and everyone across Holtec who made this possible!
👉 Read more about this historic milestone:
https://t.co/0XxuROBOnC
#PalisadesRestart #HoltecInternational #NuclearEnergy #CleanEnergy #EnergyIndependence #CarbonFreeFuture #NuclearInnovation #USNuclear #AGenerationAheadByDesign