@Willwin7 The estimated equipment order value for the 6000 MW HVDC terminal station package (evacuating power from Barmer II to South Kalamb), where GE Vernova T&D India has emerged as the L1 bidder, is approximately ₹16,000 crore to ₹17,500 crore
@vluxeinvests The estimated equipment order value for the 6000 MW HVDC terminal station package (evacuating power from Barmer II to South Kalamb), where GE Vernova T&D India has emerged as the L1 bidder, is approximately ₹16,000 crore to ₹17,500 crore
@wegro_app The estimated equipment order value for the 6000 MW HVDC terminal station package (evacuating power from Barmer II to South Kalamb), where GE Vernova T&D India has emerged as the L1 bidder, is approximately ₹16,000 crore to ₹17,500 crore
@CommissionrGHMC@GHMCOnline this issue has been escalated multiple times from past 1 month and last year ras well. I don't see this issue has been resolved till now
@GHMCOnline@revanth_anumula@CommissionrGHMC
This is Alwal st michael back gate road condition, complete 2 km stretch is full path holes and kids and women are travelling in very dangerous unsafe route. Prevent any accident and take action asap
@wardno_133ALWAL@GHMCOnline@revanth_anumula@CommissionrGHMC Same location, same torture, only change is year. Last year same post.
You should be shameful of not working for more than an year. Nobody can teach you the accountability with the public taxes it should come by default.
Today is not raining, otherwise even more pathetic