@RailwaySeva@drmdhnecr As requested, I have shared pnr and mob. no. through DM to the RailSeva X handle. Kindly inform when this train is expected to arrive Sasaram and whether the Railways will make efforts to run it on time along the remaining route.
@AshwiniVaishnaw@DRM_DDU@ECRlyHJP@RailMinIndia
Train No. 03311 is running late by 1 hour and 37 minutes. The train was scheduled to depart from Dhanbad at 23:50 hrs; however, no update regarding the delay was available on NTES till 23:00 hrs. Please give priority to this train.
@RailwaySeva@RailMinIndia@AshwiniVaishnaw
Train number 12357 is being delayed continuously by the Railways. The stoppage of this train is at Moradabad after Bareilly but it is being stopped at each station. Passenger's time has no value for Indian Railway @RailMinIndia@drm_umb@drm_mb
Presently this superfast train is standing at the outer of Moradabad station and other express trains are being taken ahead of it. @drm_mb@RailMinIndia@rail_seva
https://t.co/9fxlz0h8VB
👆 read on friends, narration of the Vande Bharat story is good, thanks all the known and less known channels, bloggers and posters, grateful indeed 🙏 but do analyze it as it is, why bring in Talgo? 😊
The Comptroller and Auditor General of India (CAG) has questioned Mumbai Civic body over increase in construction cost of #Mumbai#Coastal Road Project from ₹252 crore per kilometre in 2011 to ₹1274 crore in 2018, a 405% rise:
https://t.co/R7NDCkhTcH