@Nsantos89239312@CMO_Odisha The road Kaliajhola to Dandabadi is being improved under PMGSY PackageNO. OR-19-N144C by NBCC Ltd and the same will be completed soon.
@977717@CMO_Odisha@SRC_Odisha The road from Dandabadi to Tentuliguma has been developed under PMGSY. Tender has been invited for several time for the missing link and found no response. Now the road has been transferred to Works Department under EE R&B Division, Jeypore.
@dash_sailendu@Naveen_Odisha@PRDeptOdisha Periodic Maintenance of 6 Kms length on Achyutpur to Haripur road has been improved with cost of Rs.46.66 lakh during 2017-18. The two potholes and the berms, damaged due to laying of telephone cables, will be made good within seven days.
@SwadeshSinghdeo@Naveen_Odisha Due to heavy flow of water over the check dam, the hume pipe culvert got damaged, but the road has been repaired and made trafficable. After rainy season a new culvert will be constructed for smooth passing of water.
@SwadeshSinghdeo@Naveen_Odisha Due to heavy flow of water over the check dam, the hume pipe culvert got damaged, but the road has been repaired and made trafficable. After rainy season a new culvert will be constructed for smooth passing of water.
@abhilas88835891 @DM_Mayurbhanj@CMO_Odisha@NEWS7Odia@KANAKNEWS @Kalingatv24x7 @ssarangi11 @tdr_rairangpur This road belongs to Rairangpur Municipality area under Word No.10 of Anlafuba. Hence does not coming under RD Department.