Ketraco: Now 372km of a mix of 132kV, 220kV and 400kV should not cost more than US$ 200,000 (KShs 26m) per km. Take even 35m. Total should be Shs 13 Billion. Add the 2 Substations each and Shs 1 Billion. That is 2B.
Total should be KSHS 15B. So why is it Shs 99B??
Those Adani lines are not even required. With Kenya's measly demand of 2000MW and Nairobi taking 60% of the demand, we don't need 400kV. The Ethiopia-Tanzania 400kV interconnector already done is more than enough.
When we reach the level of S. Africa with 55,000MW demand in 200 years, then we can do those Adani lines ourselves.