Six networks: Solana, Base, BNB Chain, Ethereum, Robinhood Chain, and Arc. Paste any address. Then you trade, Buy opens once the pool is indexed,You set the size and sign it. 0% fee.
Hold Space, then 1 to 4, to fill a buy preset. q w e r sells 25, 50, 75, or 100 percent.
That fills the ticket. It sends only if you turned that on in Settings. Block still disables Buy.
Trenches is the board. Three lanes: New, Rising, Graduated.
Keys 1 to 9 switch saved views. Sniper, Curator, and Grad ship with the app. A preset buy still has to clear the gate.
Solana can block on a freeze authority or a live mint authority. EVM can block on a sell simulation under 50%, a live blacklist, pause, or mint, or an EIP-1967 proxy. Caution: early buyers over 40% on Solana, or tax over 10% on EVM.
Pass leaves Buy up. Caution puts the flags in front and still lets you send. Block turns Buy off. There is no second button. A social flag can add a caution. It cannot block a buy by itself.
You sign every trade. Hold Space, then 1 to 4. The ticket fills a buy preset.
It sends only if you turned that on in Settings. You still approve it in your wallet. Runner takes 0%.
Tape has two scopes. Following is calls and fills from people you follow.
Everyone is the public stream. Low-rep stays hidden until you ask. A row is the market cap then and later. You still sign it.
A receipt is the market cap when a post was written, and the multiple later. The caption is not the receipt. Outside text is kept 7 days. A call you write in Runner keeps its text and is free.
The gate sits on Buy. Pass leaves the button on. Caution shows the flags.
You can still send on caution. Block turns Buy off. Hotkeys do not get past it.
Following is calls and fills from people you follow. Everyone is the public stream. Low-rep authors stay hidden until you ask. A Tape row is not an order. You still sign.
Trenches is three lanes: New, Rising, Graduated. Sniper, Curator, and Grad are saved views. Keys 1 to 9 switch them. Buttons 10, 50, and 100 are preset buys. The gate can still refuse one.
Runner takes 0% of the swap. Gas is still yours. The fill settles on mainnet. This is beta, so a mistake costs real money, and there is no support desk.
You sign every trade in your own wallet. Phantom, Solflare, or an EVM wallet. The button fills a ticket. Runner never holds the key and does not send the transaction.
$RUNNER is live.
A Social Trading Terminal for New Token Markets.
You find the market.
You read the signal.
You assess the risk.
You sign the trade.
CA:
0x302e2B3c57c42A6ab0401c5b2fd8500D64139c68