We have a major auto plant in Nashik, where I’ve been going throughout my career and yet I never knew about, let alone attempted, the Mangi-Tungi trek.
It looks spectacular.
Not just a rewarding physical journey but also a soulful experience, with ancient rock-carved idols, and a chance to see one of the tallest Jain statues: the awe-inspiring 108‑ft tall “Statue of Ahimsa”
One more reminder that some of the most incredible travel experiences lie right on our doorstep.
(A cautionary note: One has to tread carefully. Only recently some members of a family met with a tragic accident when walking on the fence wall)
Video credit: @colorfullife07
#SundayWanderer
माझ��या उद्योजकीय जगात मला भेटण्याची इच्छा असलेल्या काही लोकांपैकी एक म्हणजे श्री. रतन टाटा. मात्र आज त्यांचे निधन झाले. तुम्ही मला नेहमीच प्रेरणा दिली.
भावपूर्ण श्रद्धांजली #RatanTata
गुढी पाडवा अर्थात हिंदू दिनदर्शिकेप्रमाणे चैत्र शुद्ध प्रतिपदा, शालिवाहन संवत्सराचा पहिला दिवस आणि साडेतीन मुहूर्तांपैकी ��ा एक मुहूर्त आहे. गुढीपाडव्याच्या हार्दिक शुभेच्छा!
📺 Elevate your entertainment with our cutting-edge Smart TVs! Experience the future of viewing with stunning visuals and endless content. Your living room just got smarter. #SmartTV#EntertainmentUpgrade#EndlessContent
💥 Get ready to binge-watch your favorite shows and movies like never before. Our Smart TVs combine sleek design with powerful performance for an unbeatable viewing experience. 🍿📽️🌟 #BingeWatching#UnbeatableExperience#SleekDesign
Chandrayaan-3 Mission:
Chandrayaan-3 ROVER:
Made in India 🇮🇳
Made for the MOON🌖!
The Ch-3 Rover ramped down from the Lander and
India took a walk on the moon !
More updates soon.
#Chandrayaan_3#Ch3
In the midst of #Chandrayaan3 mission, #ISRO scales another landmark with the successful launch of PSLV-C56/DS-SAR 🛰. PM Sh @NarendraModi’s consistent support enables Team @ISRO to register one success after the other in a serial form.
While Chandrayaan-3 is orbiting around the moon,
- What is the Current Space Situation around the moon?
- How the objects around the moon are tracked?
- Are there chances of close approaches?
are some of the interesting questions.
Here is an assessment by
ISRO System for Safe & Sustainable Operations Management (IS4OM)
https://t.co/VlZ4LrEryD
Chandrayaan-3 Mission:
🌎 viewed by
Lander Imager (LI) Camera
on the day of the launch
&
🌖 imaged by
Lander Horizontal Velocity Camera (LHVC)
a day after the Lunar Orbit Insertion
LI & LHV cameras are developed by SAC & LEOS, respectively https://t.co/esuVYhZuxm
https://t.co/PESoOql5ZK
Mission Gaganyaan:
🔸VSSC/ISRO, in collaboration with ADRDE/ @DRDO_India , successfully conducted Drogue Parachute Deployment Tests at the RTRS facility in Chandigarh.
🔸Drogue parachutes, armed with pyro-based mortars, stabilize and decelerate the crew module during re-entry to ensure a smooth descent.
🔸The tests instil assurance for integrating drogue parachutes into the Test Vehicle-D1 mission.
https://t.co/89HmO7tZC7
PSLV-C57/Aditya-L1 Mission:
Aditya-L1, the first space-based Indian observatory to study the Sun ☀️, is getting ready for the launch.
The satellite realised at the U R Rao Satellite Centre (URSC), Bengaluru has arrived at SDSC-SHAR, Sriharikota.
More pics https://t.co/Nz1i1npOYt
https://t.co/0JAzdTAwWO
Chandrayaan-3 Mission:
Today’s successful firing, needed for a short duration, has put Chandrayaan-3 into an orbit of 153 km x 163 km, as intended.
With this, the lunar bound maneuvres are completed.
It’s time for preparations as the Propulsion Module and the Lander Module gear up for their separate journeys.
Separation of the Lander Module from the Propulsion Module is planned for August 17, 2023.
Chandrayaan-3 Mission:
Orbit circularisation phase commences
Precise maneuvre performed today has achieved a near-circular orbit of 150 km x 177 km
The next operation is planned for August 16, 2023, around 0830 Hrs. IST
Chandrayaan-3 Mission:
The orbit-raising maneuver (Earth-bound perigee firing) is performed successfully from ISTRAC/ISRO, Bengaluru.
The spacecraft is expected to attain an orbit of 127609 km x 236 km. The achieved orbit will be confirmed after the observations.
The next firing, the TransLunar Injection (TLI), is planned for August 1, 2023, between 12 midnight and 1 am IST.