All the top cabinet wood is cut, predrilled and the first pieces are glued and fastened. Tomorrow will be to build the storage shelving in the lower section.
With the new jigs holding everything straight and square I’ve been able to add the second cabinet side within an hour of the first. Now we’ll wait for the glue to fully cure overnight before moving it.
It’s interesting what math will verify. We had 5” ducts (19.625 cu in) that necked down to 3” vents (7.065 cu in), that now flows into a 4” x 10” vent (40 cu in). That’s 153% flow improvement without restriction from the vent cover.