INDIAN EXPRESS DROPS A LAND BOMB ON BJP CM 🔥
After Mohan Yadav became Madhya Pradesh CM, his family and real estate companies reportedly bought at least 137 plots spread over 168 acres in and around Ujjain.
This is the same Ujjain being reshaped for Simhastha 2028 with highways, road widening, townships, riverfront projects, medical city, IT park and new commercial zones.
The most damning part is this: out of the 168 acres bought after he became CM, 111 acres are reportedly located along roads announced by CM Mohan Yadav himself.
His family already had land. But after Dec 2023, the land buying saw a sharp jump, right when Ujjain’s development map started turning into a goldmine.
Indian Express repeatedly asked the CM for answers. He stayed silent.
This is how BJP turns religion into a business model 😡
@Airtel_Presence from last Friday no internet and even after tweeting multiple times no response from airtel team, looks like need to switch to @jio_fiber
🚨Last night, India switched on a reactor.
Here are 9 numbers nobody is talking about:
→ 72 years: Time since Homi Bhabha conceived this plan
→ 22 years: Time to actually build it
→ ₹7,700 crore: Final cost (started at ₹3,492 crore)
→ 500 MW: Power it will generate
→ 2nd: India's global rank only Russia had this before
→ 25%: India's share of world's thorium reserves
→ 400 years: How long those reserves can power India
→ 200+: Indian companies that built it. Zero foreign designs.
→ 3: Countries that tried and quit - USA, Germany, UK
🧵 A thread that will blow your mind: