People in panathur, balagere and surrounding areas suffered before this railway under bridge was built, they are suffering even after. Third time in a span of few days this RUB in panathur is flooded. Apart from people getting stranded & risking lives, the traffic is agonising.
For 40,000 schoolchildren and their parents, the school commute to and fro through east #Bengaluru is no longer a commute. It is becoming a big part of their school day.
A recent mobility study by Inventure Academy of 42 schools along the state highway-35 corridor revealed that the average school-bus travel time has increased to 112 minutes in 2026-27 from 92 minutes in 2024-25.
Know more 🔗 https://t.co/sCVl10f94Q
Download the TOI App and stay in the know 👉 https://t.co/ogFaRsUKyn
School buses carrying children stuck near Brigade Utopia on SH-35, because a few kilometres of road have become an endurance test for Bengaluru’s children.🚨
This isn’t “traffic.” This is a daily civic failure with children paying the price.@Jointcptraffic@wftrps
How long before SH-35 gets the war-footing response it deserves? @krishnabgowda@GBAChiefComm@TVMohandasPai@rk_misra@ChristinMP_
■ Beware Property Buyers in East & South East Bengaluru■
■Traffic crisis in #Bengaluru East has literally become non-manageable & beyond repair , due to a Scam Called "CDP Roads based Plan Approval".
■ With the IT Boom, Availabality of Marshy lands at cheaper prices in collusion with local bodies, Builders have constructed Highrises, Schools , Malls, Commercial complex , with the non-existent CDP Roads.
■ All 14 CDP Roads in Stretches of Varthur- Gunjur-Sarjapura Road- Panathur- Balagere are not completed for decades.
■ Meawhile rampanat encroachments & legal hurdles doesn't give any hope.
■ Consider these factors ,before buying Properties on non-existent CDP Roads
■ #Karnataka CM @DKShivakumar & Bengaluru dev Minister @krishnabgowda shall make reforms to Building plan approvals in these areas
Day 79: Paved ends mean nothing if the middle is blocked! 🛑📋
@DKShivakumar@krishnabgowda sir, lakhs traversing Varthur–Gunjur to ORR are trapped daily because the 140-ft CDP link sits disconnected & SH-35 widening drags on with zero published timelines.
#EastBlrInfraEmergency
🚨 Day 3. Still no tweet from @krishnabgowda on the Varthur crisis.
The remarkable part?
None of this is unpredictable. The rain isn’t a surprise. The traffic isn’t a surprise. The vulnerable stretches aren’t a secret.
Only the response seems to require an appointment.💔
📌 Day 3 of the crisis. Day 3 of the silence. 🤫
@GBAChiefComm@GBA_office@TVMohandasPai@ChristinMP_@moneycontrolcom
📌Day 2. Still no tweet. Still no public response on Varthur severe Apathy 🙆♀️
@krishnabgowda Sir, at the very least, once, please visit Varthur. Meet the children and families who are spending hours stuck in traffic and listen to what they are going through.
Even a small gesture of care would matter to residents who continue to suffer while waiting for concrete action from the government.
This is not about politics. It is about children losing precious hours every day, families struggling with basic connectivity, and a crisis that keeps repeating.
Varthur needs the government to show up—literally and figuratively. We need action, accountability and a clear roadmap, not silence or avoidance.
@CMofKarnataka@DKShivakumar@ChristinMP_@TVMohandasPai@TOIIndiaNews
#Varthur #BengaluruTraffic #VarthurCrisis #CitizenPulseX
Traffic Alert – Slow movement due to Water logging -Panathur Railway Underpass with the intermittent rain.
🔸 Drive slowly on wet roads & avoid sudden braking.
🔸 Maintain Lane Discipline.
🔸Use alternative road if possible.
📞 Emergency? Dial 112
Day 2 - No tweet from @krishnabgowda about Varthur Crisis.
Some development - East Corporation did some patch work following the backlash.
Still looking for KRDCL officials !!
We waited for nearly a DECADE for the #PanathurRUB.
And after every heavy rain, this is the condition — waterlogging and traffic getting blocked on BOTH sides of the RUB.
After a decade-long wait, residents deserve infrastructure that actually works in all weather conditions.
#Panathur #Balagere #BengaluruTraffic #Bengaluru
#Bengaluru East, Varthur-Gunjur stretch, traffic issue seems to be out of control as it has become daily affair & detrimental to kids health & security.
As suggested by many Tweets, immediate /short term solutions are :
■ Staggered/revision in School timings to avoid Peak hours. 6 AM is advisable.
■ Ban on trucks/cab movements during School ferry timings.
■ Undertake minor repairs & asphalting during night hours only.
■ Extensive Traffic Management , including Citizen volunteers. Strict enforcement of Traffic rules.
■ Whereever possible, Shifing of wards to other schools & relocate residences.
■Local MLA @MALimbavali , Ex-MLA @ArvindLBJP , MP @PCMohanMP shall get into on ground action.
@DKShivakumar@krishnabgowda
The 6.2-km Gunjur–Varthur–Panathur–ORR link, planned as a 140-ft-wide corridor, can provide a crucial alternative route. After years of delays, key forest-clearance hurdles have moved forward. The remaining approvals and construction must now be expedited for timely relief.