NEW: California is bidding to host the United States Space Academy in the Bay Area, @CAGoBiz announced today.
The state is one of many making their pitch to NASA, including Florida, Colorado and Virginia.
Just 34 minutes before its cameras were turned off in 1990, Voyager 1 captured this iconic view of Earth – a pale blue dot in the vastness of space.
Today, Voyager 1 is one light-day away from Earth. A little piece of our planet journeying through interstellar space. 🌎💙
Battery manufacturers have lost more than $10B over the last 10 years due to product recalls. Meanwhile, 60% of gas turbine blades are discarded due to failed QA while the world grapples with 7 year waitlists to buy gas turbines to power data centers.
A flaw that reaches the customer costs up to 100x what it costs to catch at inspection.
@SirenOpt catches defects that are otherwise undetectable on the production line, in real time, without destroying the part. The PlasmaSens platform fires cold atmospheric plasma at a material, reads over 200,000 data points in a fraction of a second, and turns these data points into an accurate material fingerprint. Thickness, porosity, strength, and composition are all measured at once from a single instrument.
SirenOpt is already deployed across Asia, Europe, and the US in aerospace, defense, semiconductors, and energy. We’re proud to have doubled down in the company’s $25M Series A. Congratulations to Jared O'Leary, Ali Mesbah, and the whole SirenOpt team.
Lots of $$ going into turbine startups and more renders to go with them.
Meanwhile Arbor (@ArborEnergyCo) is testing their 1MW sCO2 system and scaling up to 25MW in 2027. Apply if you want to build time-to-power with a bunch of former SpaceX and GE engineers.
Endurance is on a historic run. During our mission to the Axial Seamount, we successfully drilled the world’s first subsea geothermal well and generated net-positive power a mile beneath the Pacific. This mission was the first end-to-end test of subsea geothermal, and our fifth deep-sea deployment in just over a year. For three weeks, we worked around the clock over an active underwater volcano, running the drill and generator and handling every deployment and recovery. Along the way, we:
- Landed our drill within feet of target, drilled two holes, and cased and completed the second as a geothermal well, flowing at 260°C.
- Landed Adélie, our 3-ton test plant, and ran it in real time from Seattle over subsea fiber.
- Drilled with filtered seawater, not drilling mud, and monitored the site on every dive.
- Recovered, serviced, and redeployed Adélie in about 16 hours.
- And on Sept. 27, connected to a 281°C natural vent, spun the turbine up to 26,000 rpm and ran the plant net positive for 8.7 seconds, peaking at 16.5 kW.
Net power is the threshold every new energy source has to cross. For Endurance, it proves subsea geothermal is real, and gives us the confidence to keep sprinting towards commercial scale.
With a test like this, success comes from what we learn: a battery protection trip ended the run, a pump cable failed on restart, and the new well was too restrictive to run the plant. Those lessons go straight into Gentoo, our next test plant, this winter and Leopard, our 2 MW commercial generator.
We’re incredibly proud of what we accomplished together. It took creativity, precision, an uncompromising focus on safety from everyone on board, and it’s only the beginning of what we’re capable of. We couldn’t have done it without Stabbert Maritime and the crew of the Ocean Guardian, the ROPOS team, the University of Washington, WASSOC, and the National Science Foundation.
Moonlight reflected off the Amazon river. At the proper angles in our orbit, we aboard @Space_Station can see brief silvery flashes atop water surfaces, illuminating even the darkest places on Earth.
More thoughts on the state of US battery manufacturing coming soon.
For now: proud to highlight portfolio company Electroflow's coverage in the WSJ today. Turning lithium brine directly into structurally cheaper, fully US-made LFP, this is what reshoring the battery supply chain actually looks like.
@ChEMcShane@albertwenger@LarsenJensenUSA@Alexteng@usv@VoyagerVC@fiftyyears@HarpoonVentures
Big news for US energy + battery supply chains as @AnthroEnergy breaks ground on its full-scale factory in Kentucky. @DavidMackanic is moving fast!
https://t.co/8aARp89aBY