There is a 50-metre stretch of road in Sector 68, Gurugram, that separates around 400 to 500 families at M3M Marina from the new master road GMDA is building between Sectors 68 and 69. Fifty metres. That is all. And it has been blocked.
M3M Marina's original main gate was designed to open onto this stretch. The road that would lead straight to the Sector 68-69 dividing road and from there to the Sohna Highway near Badshapur. That gate has never opened. Not once. For four to five years, every resident of Marina has been using a single secondary gate that exits onto the Aklimpur-Teekli village road. A broken, patchy road through a village. Not a backup route. The only route.
Now, after years of court disputes and a stay that was finally lifted in early 2026, HSVP cleared the encroachments on the Sector 68-69 road. Ninety percent of the land is free. GMDA tenders are nearly done. The road that thousands of residents had been waiting for is finally being built. For Marina, this should have meant one thing. The main gate could finally open.
Instead, Supertech sent people to the connecting stretch. They physically dug up the road. Residents, including school buses carrying children, were turned away. Everyone pushed back toward the same secondary gate. The same broken village road. The same 700 to 800 metres of extra distance every single day. For 400 to 500 families, the solution was 50 metres away. It was dug up in front of them.
I visited Marina yesterday with a client. The frustration on the ground is not dramatic. It is tired. These are families that have been asking for this access for years. They were told the road would come. Now a master road is actually being built right next to them. And they still cannot reach it.
Supertech owns that land. Legally, it is within its rights. Nobody is questioning the title here. But sit with the picture for a second. This is the same Supertech that is under NCLT insolvency proceedings. The same builder whose allottees have been protesting outside HRERA, demanding refunds for flats that were supposed to be delivered in 2017. A company that cannot return a single rupee to its own buyers. Cannot finish its own construction. Cannot respond to its own regulatory orders. That company still had the resources and the intent to station people at a road and physically dig it up.
A builder that cannot refund its own buyers always has the budget to block someone else's road. They all do. That is one constant across Gurugram real estate that never changes.
This is not a one-off story either. On Golf Course Extension Road, there are societies where residents pay a private landowner hefty monthly rent just to use his vacant plot as a road to reach their own homes. Because the planned connectivity was never built. The pattern repeats everywhere. Builders launch, buyers pay, and the last 50 metres of access becomes someone else's problem. Sometimes it becomes the resident's monthly bill.
The Sector 68-69 master road is being built. The hope was real. For 500 families, it still is. They are just waiting for someone to care about 50 metres.
@moneycontrolcom You are tresspassing on other ministry. Please tocus on your own ministry
I can point out umpteen and criminal ignorances made by your ministry
@derekobrienmp Ashamed to say that i was a big fan of you in my childhood, a big fan of your quiz show
Disgusting and utterly disrespectful, the way you write on public platform. Where have your morals and ethics gone?
@GauriSarin@NayabSainiBJP Double engine, then triple engine now 4 engine sarkaar
Condition remains exactly the same. In fact, the civic condition of gurugram has gone to the dogs.
The responsibile authorities should be ashamed to reduce the condition of Guruगुरु का ग्राम to such pathetic condition
@MahindraRise Proud of you.
But also sad that you have contributed to making unsafe commercial 3 wheelers and released them on indian roads, without adding any modern element of safety. As a responsible org,you should set the benchmark to make indian roads safer through your products
Such is d lawlessness in #Gurugram that dumper mafia operates without any fear of d law as @gurgaonpolice@TrafficGGM officers on duty r so corrupt dat trucks ply on city roads & highways without license/ registration plates in broad daylight.
Location- NH-48 (near IFFCO CHOWK)
Date- 24 April 2025
Time - 1015-1030 hours
1000s of such violations happen 24×7 in #Gurugram & posted on @X by citizens but no action taken ever.
Shame on d administration under @DC_Gurugram@police_haryana@DGPHaryana that @gurgaonpolice@TrafficGGM have stooped 2 a new low of corruption.
“You cannot have a profession where you use words like ‘my lord’, or when you’re doing a petition it’s called a prayer. You’ve got to be kidding me. We are all citizens of the same democratic republic”
PM EAC member Sanjeev Sanyal
#DAW2025#LatestNews#Judiciary
@AdvaitaKala@Suhelseth@YouTube I heard the Gurgaon highway ANPR system was still functional in the rains, and had sent 150 challans for driving through water without seatbelts or helmets.
Aisa nhi hai that nothing works in Gurgaon. The online challan system was working, despite heavy rains
For all those bemoaning the demise of Gurugram: think again. It’s a daily invaluable lesson in how NOT to work; NOT to govern and to remain UNACCOUNTABLE and still be elected. Kudos to this democracy.
From a national shame, Gurugram is slowly becoming an international one.
@PetroleumMin@HardeepSPuri@IndianOilcl@BPCLimited@HPCL Pay attention above *Most New Cars*. What is meaning of most & what is the definition of new?
Diplomatically admitting that there will be consequences of E20
Will the government penalise all the OEMs who claim E20 is not supported for cars made prior to 2023? Is a 2022 car old?