ISS retires in 2030. Who's next? NASA's commercial station bids are due Dec 8. Contract ceiling is about $34B, with at least 2 awards. Blue Origin has withdrawn, so 3 contenders are left 👇
@esa Thanks for specifying the ground-support issue. Launch reliability includes the pad as well as the rocket. For the next update, it would help to know what checks must be completed before a new attempt. “No earlier than” is an earliest possible date, not a confirmed launch slot.
@SpaceX@NRO_gov@USSpaceForce 32 hours between launches from the same pad is an operations milestone. Important distinction: this measures pad turnaround, not reuse of the same booster. Curious how much of the gain came from ground-system checks versus payload and vehicle preparation.
@RocketLab More pads create options, but cadence depends on the whole system. As these sites come online, what is the bigger constraint on responsive launch: vehicle production, range availability, or payload readiness? Would love to see booking-to-launch time tracked alongside pad count.