$#1BSG๐๐ GRAND RISING.CT
WELCOME TO THE #1BSG PROTOCOL
Every project starts with a promise.
The ones that last back it up with proof
๐ฅ NEW LISTING -STD#37
@AlphanumeriaSol is now scored on the 1BSG Protocol.
๐ Survival Index: 74 -๐ฅ SILVER
Numia is building a human-readable identity layer for Solana -turning long wallet strings into clean names like alex@numia. Real, working app. 165 days and still shipping.
What the chain says:
๐ฅ Burns verified on-chain - none yet
๐ LP Lock confirmed -100% burned (bonded) โ
๐ฆ Treasury publicly declared -pending
๐ Survival Index scored -74/100
Clean holder distribution, full socials, LP locked tight. One point from Gold -the path is clear: declare a treasury.
Transparency scored on-chain. No opinions. Just proof.
๐ https://t.co/1fd6kGToCE
๐ฅ Burns verified on-chain ยท ๐ LP Lock confirmed ยท ๐ฆ Treasury publicly declared ยท ๐ Survival Index scored
Good morning everyoneโจ.
We're excited to announce the official partnership with $#1BSG community from
@numberoneBSG ๐ค.
You can now buy, swap and trade your $#1BSG on the Gensuki Dex Aggregator.
Tracked token address: https://t.co/tv4xmzbhMe
โ Deeper liquidity routes
โ Price impact
$#1BSG๐๐ ..GM CT
SOME IMPORTANT UPDATES FOR THE
https://t.co/1fd6kGToCE
๐ YOU CAN'T BUY DIAMOND.
Every other tracker gives you a green checkmark for showing up. We built something that can't be faked, bought, or rushed. Here's how the Survival Index actually works โ for degens AND devs. ๐งต
โ
๐ THE SCORE (0โ100)
Your token gets a live Survival Score, re-read off the chain every day. Four tiers:
๐ฅ BRONZE (25โ49) โ showing up
๐ฅ SILVER (50โ74) โ doing the work
๐ฅ GOLD (75โ89) โ strong on every pillar
๐ DIAMOND (90โ100) โ survived. earned. untouchable.
โโ
๐ฅ THE FOUR PILLARS (what we read)
๐ฅ Burns โ verified on-chain, not screenshotted
๐ LP Lock โ locked or burned, we check the contract
๐ฆ Treasury โ publicly declared, project-controlled
๐ Survival Index โ all of it, scored live
No forms to fake. The chain doesn't lie, so neither does your score.
โ
๐ WHY DIAMOND IS DIFFERENT
Gold you can earn in a day. Do everything right โ burn your supply, lock your LP, declare your treasury, spread your holders โ and you hit Gold by tonight.
Diamond? Diamond makes you WAIT.
It's not a point total. It's a GATE. To even qualify, you need ALL of these AT THE SAME TIME:
๐ Alive 270+ days (~9 months)
๐ LP burned, or locked 180+ days out
๐ฅ Top 10 wallets under 15%
๐ฅ 2%+ supply burned
๐ฆ Treasury declared AND re-confirmed in the last 30 days
Here's the part that matters:
A whale could fund a "perfect" token tomorrow. Max burns. Locked LP. Clean treasury. Beautiful chart. And it STILL can't touch Diamond โ because it hasn't survived 9 months yet. There is no amount of money that skips the clock.
Diamond means: this project was here 9 months ago, it's still here, and every metric held the whole way. That's not a launch. That's a track record.
โโ
โฑ๏ธ AND IT STAYS HONEST
A score frozen at launch is a lie waiting to happen. So proofs age:
โ๏ธ On-chain stuff (burns, LP, locks, holders) โ re-read daily, automatic, forever
๐ Static stuff (team, roadmap, product) โ prove once, it holds
โฑ๏ธ Living stuff (recent posts, active community) โ fades if you go quiet, because a dead project shouldn't look alive
Stop shipping? Your score knows. That's the whole point.
-
๐ ๏ธ DEVS โ verify your own project
New self-serve portal is LIVE. No wallet connect, zero friction:
1๏ธโฃ Paste your wallet โ we scan your $1BSG holdings live
2๏ธโฃ Hold 1M+ โ your checklist unlocks
3๏ธโฃ Drop your proof links โ verified โ scored
Your burns and locks are already counted automatically. The portal is for the human stuff โ team, roadmap, product, community.
๐ https://t.co/gyJHCGVtmN
$#1BSG๐๐๐
HAPPY MOMENTUM MONDAY
๐ก STD#35: $RANDO โ and this one's a story. @rando_rewards
The dev told us straight: "We don't do burns. I haven't locked anything. The value is the utility."
We listed him anyway. Score: 52 SILVER.
Why? Because the chain had something to say: 17.96% top10 concentration โ the best holder distribution of our entire July batch. 153 holders, nobody over 3%. Provably-fair reward draws, every payout TX public.
He didn't chase the metric. He earned it by accident.
And his path to Gold is now public: lock the LP (โ72), declare the reward vault he already runs (โ72), burn (โ78). His words: "at some point I will burn and lock." The leaderboard is watching. ๐
๐ฅ Burns verified on-chain
๐ LP Lock confirmed
๐ฆ Treasury publicly declared
๐ Survival Index scored
35 tokens. Zero pay-for-score.
๐ https://t.co/1fd6kGToCE
$#1BSG๐๐๐
SUPPLY LOCK vs LP LOCK โ not the same thing. Teams mix these up every week, so here's the difference and why the protocol scores BOTH:
๐ฐ LP LOCK = protecting the EXIT DOOR
The liquidity pool is what lets people sell. If the team controls the LP, they can pull it โ price instantly goes to zero, nobody can exit. That's the classic rug.
LP locked/burned = the door can never be removed. This protects EVERY holder's ability to leave.
๐ SUPPLY LOCK = protecting against the AVALANCHE
Different risk entirely: the team/dev wallets holding a big % of supply. Even with LP locked forever, a dev dumping 30% of supply into the pool crushes the price 90%. The door works fine โ there's just an avalanche coming through it.
Supply locked (Streamflow, non-cancelable) = those tokens physically CANNOT move until the unlock date. The avalanche is frozen.
Two locks, two rugs prevented:
โ LP unlocked โ they can take the exit away
โ Supply unlocked โ they can flood the exit
โ Both locked โ neither rug is possible. That's what "safe" actually means on-chain.
How the Survival Index scores them:
๐ LP lock/burn โ V1 pillar, up to +20 โ permanent protection, permanent points
๐ Supply lock โ V2 category, up to +8, DECAYING to zero at the unlock date โ because a supply lock is a promise with an expiry, and the score honestly matches the calendar
One lock without the other is half a promise. The chain sees both.
๐ฅ Burns verified on-chain
๐ LP Lock confirmed
๐ฆ Treasury publicly declared
๐ Survival Index scored
https://t.co/1fd6kGToCE โ the chain decides.
#1BSG๐๐๐
๐จ BIGGEST DAY IN 1BSG PROTOCOL HISTORY
4 new listings in 24 hours. Registry now at 34 tokens.
And one listing just wrote the best proof-of-concept we could ask for. Thread ๐งต
2/6 Every token gets scored /100 on 4 pillars โ verified, not self-reported:
๐ฅ Burns verified on-chain
๐ LP Lock confirmed
๐ฆ Treasury publicly declared
๐ Survival Index scored
No pay-for-score. The chain is the judge.
3/6 THE STORY: $WSS listed yesterday at 44 BRONZE.
Our sync engine then verified a 20.16% supply burn directly on-chain โ 798M current supply vs 1B minted. Not claimed. VERIFIED.
Score: 44 โ 84 GOLD. Top-6 overnight.
That's the protocol working exactly as designed.
4/6 THE NEW FOUR:
$FMEME โ 62 SILVER ยท 99.99% LP secured (65% burned + Raydium Burn & Earn)
$M11B โ 62 SILVER ยท graduated, 100% LP burned
$WSS โ 84 GOLD ยท verified 20.16% supply burn
$LAZYPOS โ 34 BRONZE
5/6 Why list a 34?
Because a registry that only lists winners is marketing.
$LAZYPOS gets what every token gets: an honest score and a public roadmap up โ declare treasury (+20), verify a burn (+26), graduate the curve (+20). Do the work, climb the board. That's the game.
6/6 34 tokens. 10 Founding Partners. V2 scoring engine now running in shadow.
Want your token scored? The scan takes a day. The chain does the talking.
๐ https://t.co/1fd6kGToCE
๐ฅ๐๐ฆ๐