Cold weather tip: if you're planning a bathroom or kitchen remodel for after the holidays, now's a good time to pick fixtures and tile. Lead times don't care about your calendar.
One thing I always go over before we open a wall: the quote assumes the framing, plumbing, and electrical are in decent shape. You don't really know until demo starts. If something's hidden in there, we stop and talk it through before anything else gets done.
The part of a bathroom remodel that never makes the after photos is the waterproofing. If that layer isn't done right, the tile on top of it doesn't matter much.
Once the heat kicks on in these older Northeast Ohio houses, you start noticing the little things summer hid. A bathroom that felt fine in July can feel completely different in November.
Pulled up a bathroom floor recently and found soft subfloor all around the toilet. It was a slow leak that had been going for years. The tile looked fine on top. It almost always does.