@B_iswajitbehera@AshwiniVaishnaw@EastCoastRail Sir, we sincerely apologize for the inconvenience caused. The lighting issue was rectified during the previous night by turn on the switch. The defective fans have also been replaced with serviceable units, and the fans are now functioning normally. https://t.co/QkakWXHV2g
@RailwaySeva@_aka_gerry@DRMSambalpur We regret the inconvenience caused. Upon inspection at NPD station, all fans were found to be in proper working condition. The temporary non-functioning of fans was due to an interruption in the local power supply. After restoration of power, all fans resumed normal operation.
@AnilKumar780588@RailwaySeva@EastCoastRail@DmSambalpur@RailMinIndia Sir, the inconvenience caused is sincerely regretted. Due to ongoing renovation works under the Amrit Bharat Station Scheme, the fans were temporarily switched off during civil maintenance activities. The work has been attended and the fans are now functioning normally.
@DRMSambalpur@pranavkesinga@SBPSRDENCO Sir, inconvenience caused is deeply regrated, railway is committed to ensure a comfortable, safe and secure journey for its passenger . Our staff attended and resolved your electrical issue.
@RailwaySeva@jaynamlag01@DRMSambalpur On-duty staff attended the complaint at PF-1, KBJ Station and found the fan switch in OFF position. The issue was rectified by switching ON the fan and the fan was observed working normally.
@laxmidhar2239@DRMSambalpur Sir, Water Cooler maintenance staff attended the complaint and checked both water coolers. The PF-3 water cooler was found working with proper cooling. The PF-1 water cooler was found having less cooling.And arrangements are being made, normal cooling will be restored shortly.
@DibyaduttaJ@DRMSambalpur Sir, the station is presently undergoing development and infrastructure upgradation works; therefore, fan and certain amenity facilities are not currently available. Necessary arrangements are being planned, and the facilities will be provided for the convenience of passengers.
@BerliaParas@RailwaySeva Sir, inconvenience caused is deeply regrated, railway is committed to ensure a comfortable, safe and secure journey for its passenger . Our staff attended and resolved the issue.
@RailwaySeva@Suraj_prdhn@DRMSambalpur Sir, Railway is committed to comfortable, safe, and secure journey to its passengers. As per your information , the escorting staff attended the complaint, checked the electrical panel & found it requiring attention. The panel was properly closed and the issue was rectified.
@Ashishs07502332@RailMinIndia@RailwaySeva@DRMSambalpur@secrrly Sir, the issue was attended by BLGR on-duty staff and a thorough inspection of all coaches of the concerned train was conducted. During checking, all fans were found in proper working condition.
@vickysharma212@RailMinIndia@IRCTCofficial@AshwiniVaishnaw Due to loco reversal at ASR station, the power supply was temporarily shut off. After completing the loco attachment, the power supply was restored and the AC resumed normal functioning.
@Govinda12807@PMOIndia@AshwiniVaishnaw@EastCoastRail Sir, we sincerely regret the inconvenience caused. The issue was attended by KBJ electrical staff and necessary rectification was carried out successfully. At present, the fans, lights, and water cooler are working normally.
@RameshBaghx6@AshwiniVaishnaw@RailMinIndia@narendramodi Sir inconvenience caused is deeply regretted. Due to failure of the HOG power supply, the AC system remained non-functional for some time. Subsequently the DG set was started to restore power supply, after which the AC system started functioning normally and cooling was restored.
@DRMSambalpur@Santosh80886224 Sir, inconvenience caused is deeply regretted. AC mechanic attended the complaint the Test Room Control unit at Sambalpur. On inspection, the PCB was found faulty therefore, it has been handed over for repair. Necessary action is being taken on priority for early restoration.
@maheshprasadna2@AshwiniVaishnaw@OfficeDp@PMOIndia@indianrailway__@DRMSambalpur We deeply regret the inconvenience caused. At Rairakhol Railway Station, the lift could not function due to failure of the local power supply from the DISCOM side. However, the local power supply has now been restored, and the lift is functioning normally.
@DRMSambalpur@RailwaySeva@Chouhanashish Sir, we sincerely regret the inconvenience caused. The matter has been informed to the concerned official for inspection and necessary action will be taken shortly to resolve the issue.
@DRMSambalpur@Santosh80886224@SBPSRDENCO Sir, we sincerely regret the inconvenience caused. The matter has been informed to the concerned official for inspection and necessary action will be taken shortly to resolve the issue.
@habula76@DRMSambalpur Due to the ongoing construction and renovation work in the PF-1 area of BRGA Station, the lift has been temporarily shut down for operational and passenger safety reasons. The matter has noted and the lift will be restored to normal working condition after completion of the work.