π Introducing Suplymate, a smarter way to source industrial materials.
Discover suppliers worldwide and contact them directly, compare products and prices, track material prices with alerts, and ask Mate, our AI sourcing assistant.
2 min walkthrough π We'd love your feedback.
41% of negative comments in ISM's October factory survey cited longer lead times. One buyer: "four weeks is now 50 weeks."
Before you compare steel quotes on price, ask: weeks from what? Firm or subject to prior sale? What day does it land at your dock?
Source in reply.
@miltradechain That's the part most scenarios skip. What took decades to build can't be replaced overnight, so near-term plans still have to work with today's supply base.
@ayonitemee The cheapest location used to win by default. Now lead time and how many places a part can come from get weighed next to unit cost, which is a healthier way to buy.
@1slamchina 582,000 in one month is a lot of battery and motor capacity. Buyers still have to check which factory actually makes their part and how steady its own parts supply is.
@chits_global Claim handling is the one people forget until the first bad shipment. Worth agreeing on how a quality dispute gets settled before the first container leaves.
@itsalvinhuang The teapot lesson is one a lot of sellers learn the hard way. If anyone can order the same product from the same factory, your edge is gone. Supplier relationships that take years are much harder to copy.
@juliachaigneau Getting read as "just a materials supplier" happens a lot in deep tech. People file you by the first thing they see, so the story has to lead with what the material makes possible, like range and charge time.
@TheBriefLive A demo part in the EQS is the easy step. Whether green iron can scale up and fit into a carmaker's steel supply chain is what this MoU now has to answer.
@USTechGlobal Quoting quietly eats a lot of time in electronics manufacturing. If an integration pulls supplier pricing straight into the quote, that's one less round of chasing prices line by line on a BOM.
@mattbeane Agreed. A demo needs one robot that works. A product needs every part available at volume, and a second source for anything that can stop the line.
This cable factory has its own port.
Hellenic Cables' plant in Corinth, Greece, can make 50,000 tonnes of cable a year. Up to three ships can load right at the plant at once. Source in reply.
@XsuperMold The tooling cost and mold lead time are why a lot of teams run early volumes on printed or soft tooling, then move to steel molds once the design stops changing.
@LogicalSG Staging spare parts near customers before peak is the smart part. A sorter down on Cyber Monday is a parts problem before it's a technician problem.