NEW FACTORY: Lancashire-based engineering group @wecgroupltd set to create 144 jobs at new production facility & training academy in Blackburn https://t.co/UpflGFOlLd #STEM#UKmfg#GBmfg🇬🇧
Construction industry
1.Used as a binder in plaster, gypsum, putty powder, mortar or other building materials to improve processability and extend operating time. Prevents the slurry from drying and cracking too quickly after spraying, and the strength is enhanced after hardening
2014 DEMAG CC6800 1250 tones Available for Wind Farm Project
We can supply a supervisor/engineer to assemble/disassemble the crane on site.
Please contact for the more information.
2009 DEMAG CC2800, Capacity (t): 600 tones Available
Used for Wind Farm Construction & Maintenance. Qudro-Drive tracks in-lieu-of standard Duo-Drive, 2000mm (79”) wide track shoes. Working Hours 9,432. Factory preparation for future Narrow Track (NT) option
CC6800 is available now in Korea. We we are pleased to offer you as follows.
Model : Demag CC6800
Capacity : 1,250 ton
Year : 2009
Running hour : 3,250 hrs.
Boom : 96m + luffing jib 60m + mast boom 40.5m
Hook : 800t, 500t, 70t
Counter weight (for main body) : 250 ton
2015 CK1100G available in Texas
>> 2015 Kobelco CK1100G, S/N GH0-03384
>> 90’ of main boom
>> 75 ton block
>> 13 ton ball
>> single sheave boom point extension
Thanks
Supreme Cranes International
[email protected]
2014 DEMAG CC6800 1250 tones Available for Wind Farm Project
We can supply a supervisor/engineer to assemble/disassemble the crane on site.
Please contact for the more information.
2009 DEMAG CC2800, Capacity (t): 600 tones Available
Used for Wind Farm Construction & Maintenance. Qudro-Drive tracks in-lieu-of standard Duo-Drive, 2000mm (79”) wide track shoes. Working Hours 9,432. Factory preparation for future Narrow Track (NT) option