On this project, we were able to achieve this level of quality at a very minimal cost. The project couldn't afford the use of H beams and acro props yet the quality of formwork was not compromised. We had to manage the project such that waste was completely eliminated.
I hate PO. Imagine! I just heard Northern Muslims in Anambra state singing the praises of this bigot. They told us how he sponsored there trips to Mecca, provided them with cash and gift materials and gave them conducive environment
How can he be so bigoted? North must hear this
@Structurecity Very true. Inadequate skilled workers in the construction industry has resulted to more employment of foreign workers from our neighboring country.
One good thing about them is that they do the job very well more than our indigenous artisan.
#Projectupdate
Project Title: IHS Solar Project
Client: Eauxell Nigeria Limited/IHS
Over 40 sites spread across Anambra, Delta, Edo and Oyo state Executed by Structurecity within 3 months.
https://t.co/n5lmBbTNz8
These seasoned timber has been used over 3 times yet they still maintain their straightness and strength. Why do you want to spend so much on H beams when you can save up to 70% and still get the same result?
#valueengineering#Buildsmart with #Structurecity
Just In!
INEC are cleaning up the IREV, they are uploading the real results.
Kindly take a screen record of as many PU/Wards results as possible.
Retweet this information as it is very important.
TREAT AS URGENT
JUST IN: Nationwide protest may be inevitable if INEC fails to uphold Peter Obi's landslide victory. The masses are losing faith in INEC over the persistent failure to upload results electronically.